R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




TABLE OF CONTENTS
1    INTRODUCTION                                                                                           1
     1.1. OBJECTIVE & SCOPE                                                                                 1
     1.2. LEGAL REQUIREMENTS                                                                                2
     1.3. GUIDELINES, LICENCE & SUPPORTING INFORMATION                                                      2
     1.4. LICENCE CONDITIONS AND WATER QUALITY OBJECTIVES                                                   2
     1.5. HIGH & LOW EROSION HAZARD SITES                                                                   3
           1.5.1. LOW EROSION HAZARD SITES                                                                  3
           1.5.2. HIGH EROSION HAZARD SITES                                                                 3
     1.6. PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE                                               4
           1.6.1. DRAINAGE CONTROL                                                                          4
           1.6.2. SEDIMENT CONTROL.                                                                         5
           1.6.3. EROSION CONTROL                                                                           5
2    SITE DESCRIPTION                                                                                       6
     2.1. LOCATION AND OPERATIONS                                                                           6
     2.2. CLIMATE                                                                                           6
     2.3. TOPOGRAPHY                                                                                        7
3    EXISTING STORMWATER MANAGEMENT                                                                         8
     3.1. PREVIOUS DESIGNS & UPGRADES                                                                       10
           3.1.1. SW5 HES BASIN                                                                             10
4    FUTURE WORKS                                                                                           11
     4.1. PROPOSED NORTHERN PRECINCT DEVELOPMENT                                                            11
           4.1.1. SW2 HES BASIN                                                                             12
           4.1.2. LOW EROSION RISK AREAS                                                                    12
5    SITE INSPECTION AND MONITORING                                                                         14
6    RECOMMENDATIONS                                                                                        15
7    REFERENCES                                                                                             16
APPENDIX A CATCHMENT & DRAINAGE PLAN                                                                        A
APPENDIX B SW5 DESIGN REPORT                                                                                B
APPENDIX C RRA (SW2) CONCEPT DESIGN REPORT – HES BASIN AND DRAINAGE                                         C
APPENDIX D IPWEAQ BIORETENTION SYSTEM STANDARD DRAWINGS                                                     D




TABLE OF FIGURES
FIGURE 1 - SITE LOCALITY PLAN (SOURCE: NEARMAP)                                                             1
FIGURE 2 – AERIAL PHOTOGRAPHY AND DISTURBED AREAS (SOURCE: NEARMAPS, IMAGE DATE 24-06-26)                   6
FIGURE 3 – AVERAGE MONTHLY RAINFALL FOR TEWANTIN                                                            7
FIGURE 4 – EXISTING CATCHMENT PLAN                                                                          8
FIGURE 5 – EXISTING DRAINAGE FEATURES                                                                       10
FIGURE 6 – SITE PLAN (SOURCE: COVEY PROJECT NO. 244035, SHEET NO. C1002)                                    12
FIGURE 7 – TYPICAL CONVENTIONAL BIORETENTION SYSTEM PROFILE (EXTRACT IPWEAQ DRAWING DS073)                  13
FIGURE 8 – TYPICAL UNCONSTRAINED SATURATED ZONE BIORETENTION SYSTEM PROFILE (EXTRACT FROM DRAWING DS070).   13


TABLE OF TABLES
TABLE 1 – SURFACE WATER RELEASE LIMITS                                                                      3
TABLE 2 – CATCHMENT DETAILS                                                                                 9




Environment. Engineering. Education.                                                                             PAGE ii

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.