R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN
TABLE OF CONTENTS
1 INTRODUCTION 1
1.1. OBJECTIVE & SCOPE 1
1.2. LEGAL REQUIREMENTS 2
1.3. GUIDELINES, LICENCE & SUPPORTING INFORMATION 2
1.4. LICENCE CONDITIONS AND WATER QUALITY OBJECTIVES 2
1.5. HIGH & LOW EROSION HAZARD SITES 3
1.5.1. LOW EROSION HAZARD SITES 3
1.5.2. HIGH EROSION HAZARD SITES 3
1.6. PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE 4
1.6.1. DRAINAGE CONTROL 4
1.6.2. SEDIMENT CONTROL. 5
1.6.3. EROSION CONTROL 5
2 SITE DESCRIPTION 6
2.1. LOCATION AND OPERATIONS 6
2.2. CLIMATE 6
2.3. TOPOGRAPHY 7
3 EXISTING STORMWATER MANAGEMENT 8
3.1. PREVIOUS DESIGNS & UPGRADES 10
3.1.1. SW5 HES BASIN 10
4 FUTURE WORKS 11
4.1. PROPOSED NORTHERN PRECINCT DEVELOPMENT 11
4.1.1. SW2 HES BASIN 12
4.1.2. LOW EROSION RISK AREAS 12
5 SITE INSPECTION AND MONITORING 14
6 RECOMMENDATIONS 15
7 REFERENCES 16
APPENDIX A CATCHMENT & DRAINAGE PLAN A
APPENDIX B SW5 DESIGN REPORT B
APPENDIX C RRA (SW2) CONCEPT DESIGN REPORT – HES BASIN AND DRAINAGE C
APPENDIX D IPWEAQ BIORETENTION SYSTEM STANDARD DRAWINGS D
TABLE OF FIGURES
FIGURE 1 - SITE LOCALITY PLAN (SOURCE: NEARMAP) 1
FIGURE 2 – AERIAL PHOTOGRAPHY AND DISTURBED AREAS (SOURCE: NEARMAPS, IMAGE DATE 24-06-26) 6
FIGURE 3 – AVERAGE MONTHLY RAINFALL FOR TEWANTIN 7
FIGURE 4 – EXISTING CATCHMENT PLAN 8
FIGURE 5 – EXISTING DRAINAGE FEATURES 10
FIGURE 6 – SITE PLAN (SOURCE: COVEY PROJECT NO. 244035, SHEET NO. C1002) 12
FIGURE 7 – TYPICAL CONVENTIONAL BIORETENTION SYSTEM PROFILE (EXTRACT IPWEAQ DRAWING DS073) 13
FIGURE 8 – TYPICAL UNCONSTRAINED SATURATED ZONE BIORETENTION SYSTEM PROFILE (EXTRACT FROM DRAWING DS070). 13
TABLE OF TABLES
TABLE 1 – SURFACE WATER RELEASE LIMITS 3
TABLE 2 – CATCHMENT DETAILS 9
Environment. Engineering. Education. PAGE ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.