R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



Table 2 – Catchment Details

    CATCH                AREA          MIN. ELEVATION            MAX. ELEVATION   AVERAGE SLOPE   25 %ILE SLOPE
      ID                  (ha)            (m AHD)                   (m AHD)            (%)             (%)

          1                0.47             12.7                      15.2             3.2             1.6

         2                 1.72             13.2                      16.9             5.9             2.0

         3                 0.52             13.0                      17.2             12.4            3.6

         4                 1.22             11.1                      15.6             10.9            3.5

         5                 3.33             11.4                      17.8             6.3             1.2

         6                 2.15             11.3                      17.7             3.0             0.7

         7                 0.85             14.3                      19.8             15.2            3.1

         8                 1.01             13.8                      19.8             8.4             2.0

         9                 3.73             13.8                      40.3             19.2           14.8

         10                3.28             15.6                      40.1             13.3            6.4

         11                2.96             14.6                      40.5             14.1            5.7

         12                0.40             16.6                      21.7             10.2            3.4

         13                1.00             16.2                      30.1            22.4             5.6

         14                3.05             16.8                      37.7             16.0            6.3

         15                1.88             17.4                      39.6             13.9            8.6

         16                2.21             18.0                      37.7             10.9            3.6

         17                2.49             19.5                      36.3             13.2            4.7

         18                0.35             23.3                      28.3             14.8            6.6

         19                1.75             19.0                      28.4             15.8            5.5

        20                 1.23             20.0                      26.2             12.0            5.7

         21                4.33             16.7                      30.6             9.7             2.9

        22                 1.19             16.9                      30.4            20.0             3.3




Environment. Engineering. Education.                                                                         PAGE 9


[OCR of page images]
E RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN TOPO.

 

Table 2 - Catchment Details

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CATCH AREA MIN. ELEVATION MAX. ELEVATION AVERAGE SLOPE 25 %ILE SLOPE
ID (ha) (m AHD) (m AHD) (%) (%)
1 0.47 12.7 15.2 3.2 1.6
2 1.72 13.2 16.9 5.9 2.0
3 0.52 13.0 17.2 12.4 3.6
4 1.22 11.1 15.6 10.9 3.5
5 3.33 11.4 17.8 6.3 12
6 2.15 11.3 17.7 3.0 0.7
7 0.85 14.3 19.8 15.2 3.11
8 1.01 13.8 19.8 8.4 2.0
9 3.73 13.8 40.3 19.2 14.8
10 3.28 15.6 40.1 13.3 64
11 2.96 14.6 40.5 141 5.7
12 0.40 16.6 217 10.2 3.4
13 1.00 16.2 30.11 22.4 5.6
14 3.05 16.8 377 16.0 6.3
15 1.88 17.4 39.6 13.9 8.6
16 2.21 18.0 377 10.9 3.6
17 2.49 19.5 36.3 13.2 47
18 0.35 23.3 28.3 14.8 6.6
19 175 19.0 28.4 15.8 5.5
20 1.23 20.0 26.2 12.0 5.7
21 4.33 16.7 30.6 9.7 29
22 1.19 16.9 30.4 20.0 3.3
Environment. Engineering. Education. PAGE

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.