Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Very large file (19.4 MB): may take a few minutes to open.
R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN Figure 5 – Existing Drainage Features 3.1. PREVIOUS DESIGNS & UPGRADES 3.1.1. SW5 HES BASIN Previous modelling and designs were undertaken by Topo for a Type A HES for the southern catchment, being directed to the SW5 outlet. The basin was designed for a 4.5 ha catchment, with a clean water diversion drain sized for a maximum 6.2 ha catchment to divert clean water flows around the basin. Drains were sized for the 1 in 10 year ARI critical storm. The basin was assessed using a MUSIC water-balance model against the EA requirement to treat 90 % of annual runoff. The modelling demonstrated 90.3 % annual runoff treatment is achieved, exceeding the performance of a 10 year 24 hour traditional basin (85.2 %). The basin includes automatic flocculant dosing and a monitoring system reading turbidity, pH, electrical conductivity and dissolved oxygen, linked to a power-actuated outlet valve that closes when readings fall outside the EA release limits. Refer to Appendix B – Design Report & Maintenance and Inspection Plan: Noosa Landfill – Clean Water Drain & High- Efficiency Sediment Basin (SW5) for further details. Environment. Engineering. Education. PAGE 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.