R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN
4 FUTURE WORKS
4.1. PROPOSED NORTHERN PRECINCT DEVELOPMENT
The northern portion of the site is proposed for redevelopment as part of the Doonan Landfill Resource Recovery Facility
upgrade (Stage 1A). The proposed works, as summarised in Table 2, comprise a composting facility, new site offices and
amenities, internal access roads, drainage. A new a HES basin is also proposed and will discharge runoff to release point
SW2. Additional details, including detailed civil and stormwater design, are being undertaken by Covey Associates.
Table 2 – Proposed Northern Precinct Works
ELEMENT DESCRIPTION
Composting facility In-vessel composting (IVC) facility for green organics to be located adjacent to the RRA pad.
New transfer station building with associated site office and amenities (Sherson Architecture
Site offices and amenities
concept design, 2026), public and customer weighbridges, and gravel hardstand parking.
Reconfigured internal access roads and site entrance, including a 5.0 m x 2.4 m reinforced
Roads
concrete box culvert (RCBC) crossing on the site entrance.
Earthworks and drainage infrastructure, including overland flow (clean-water) swales to divert
Drainage external catchment runoff around the site and convey local flows, with dirty-water drainage
directed to the HES basin.
Type A HES basin (Covey Associates, 2026) with a surface area of approximately 2,733 m²,
High efficiency sediment treating approximately 6.0 ha, with optional constructed floating wetlands for nutrient polishing.
basin Designed for controlled release in accordance with EA Condition WT2 (TSS not exceeding 50
mg/L) at SW2.
For further details, please refer to the extract of the Doonan Resource Recovery Development Site Plan presented as
Figure 5.
Environment. Engineering. Education. PAGE 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.