5 SITE INSPECTION AND MONITORING
SMPs should be considered live documents that in some instances will require review and updating as site conditions
change, or if the adopted measures fail to achieve the required treatment standard.
Site inspections and monitoring are to be undertaken as detailed below. When a site inspection detects a notable failure
in the adopted drainage or other ESC measures, the source of this failure must be reported, investigated and appropriate
amendments made.
Best practice site management requires all ESC measures to be inspected at the following frequencies and include the
following checks as a minimum:
Daily site inspections (during rainfall)
+ All drainage, erosion and sediment control measures
+ Occurrences of excessive sediment deposition (whether on-site or off-site)
+ All site discharge points (including dewatering activities as appropriate)
Weekly site inspections (even if work is not occurring on-site)
+ All drainage, erosion and sediment control measures
+ Occurrences of excessive sediment deposition (whether on-site or off-site)
+ Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
movements
+ Oil, fuel and chemical storage facilities
Following runoff producing rainfall (within 18 hours of rainfall event)
+ All drainage, erosion and sediment control measures
+ Occurrences of excessive sediment deposition (whether on-site or off-site)
+ Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
movements
Environment. Engineering. Education. PAGE 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.