6 RECOMMENDATIONS
The following recommendations are made as landfilling operations continue across the site and design of the northern
precinct redevelopment continues.
+ Assess the catchments within the active filling zones and ensure all disturbed areas are being directed to an
appropriately sized sediment control.
+ Inspect the eastern boundary on the edges of Catchments 12 and 22 and ensure all runoff has been managed
in accordance with the site permit and discharged at an appropriate location.
+ Implement the recommendations of the Topo concept design and Covey stormwater management plan for the
upgraded HES basin at SW2.
+ Investigate options for the treatment of runoff from low erosion risk areas in the northern portion of the Doonan
Landfill Resource Recovery Facility, which is likely to be bioretention systems.
+ Ensure all drainage for the Doonan Resource Recovery development is designed to convey peak flows associated
with the 1 in 10 year (10% AEP) event per DETSI 2025, or as required to ensure the necessary flow rates are
conveyed to the HES basin to achieve the annual runoff treatment percentage necessary.
Environment. Engineering. Education. PAGE 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.