R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



6                RECOMMENDATIONS
The following recommendations are made as landfilling operations continue across the site and design of the northern
precinct redevelopment continues.

       +      Assess the catchments within the active filling zones and ensure all disturbed areas are being directed to an
              appropriately sized sediment control.
       +      Inspect the eastern boundary on the edges of Catchments 12 and 22 and ensure all runoff has been managed
              in accordance with the site permit and discharged at an appropriate location.
       +      Implement the recommendations of the Topo concept design and Covey stormwater management plan for the
              upgraded HES basin at SW2.
       +      Investigate options for the treatment of runoff from low erosion risk areas in the northern portion of the Doonan
              Landfill Resource Recovery Facility, which is likely to be bioretention systems.
       +      Ensure all drainage for the Doonan Resource Recovery development is designed to convey peak flows associated
              with the 1 in 10 year (10% AEP) event per DETSI 2025, or as required to ensure the necessary flow rates are
              conveyed to the HES basin to achieve the annual runoff treatment percentage necessary.




Environment. Engineering. Education.                                                                                    PAGE 15

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.