Council archive · source document
Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Very large file (19.4 MB): may take a few minutes to open.
R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN 7 REFERENCES Covey Associates Pty Ltd, 2026. Stormwater Management Plan – Doonan Landfill, 561 Eumundi-Noosa Road, Doonan (244035, M26-0032Rpt, Issue A), Maroochydore: Covey Associates Pty Ltd. Covey Associates Pty Ltd, 2026. Flood Impact Assessment – Doonan Landfill (M25-0479Rpt-A), Maroochydore: Covey Associates Pty Ltd. Covey Associates Pty Ltd, 2026. Doonan Resource Recovery Redevelopment – Complete Site Plan (Drawing C1000, Issue F), Maroochydore: Covey Associates Pty Ltd. Department of the Environment, Tourism, Science and Innovation (2025) Guideline: Stormwater and Environmentally Relevant Activities, ESR/2015/1653, Version 1.08, State of Queensland. OREZ, 2026. Noosa Composting Facility – Process Design Strategy (PR25001, Revision 03), OREZ. Sherson Architecture, 2026. Noosa Compost Facility – Conceptual Design, 30% Submission (20260272-CP), Sherson Architecture. Institute of Public Works Engineering Australasia (IPWEAQ), 2017. Queensland Urban Drainage Manual (QUDM), Fourth Edition, Brisbane: IPWEAQ. Noosa Council, 2020. Noosa Plan 2020, Noosa: Noosa Council. Environment. Engineering. Education. PAGE 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.