R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN
1 INTRODUCTION
Topo was engaged by Noosa Council to prepare a Stormwater Management Plan (SMP) for the Noosa Resource
Recovery Centre (NRRC). The site is located on Eumundi-Noosa Road as illustrated in Figure 1.
The site currently operates under the Environmental Authority Permit No. EPPR01855314 and is licensed to carry out the
following environmentally relevant activities (ERA):
+ ERA 33 – Crushing, milling, grinding or screening > 5000 t per year
+ ERA 60-(1a) – Waste disposal facility < 50,000 t/yr
Figure 1 - Site Locality Plan (Source: NearMap)
1.1. OBJECTIVE & SCOPE
The objective of this report is to provide an Interim Stormwater Management Plan for the site, taking into consideration
the current conditions and future works, and identify how runoff will be managed to comply with the relevant guidelines
and licence conditions.
Once the layout for the future works, particularly the development of the northern portion of the site, is confirmed,
hydrologic and hydraulic modelling will be undertaken to size all required drainage features.
This report addresses surface water only and does not include the management of groundwater or leachate.
Environment. Engineering. Education. PAGE 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.