LEGEND:
CATCHMENT BOUNDARY
CLEAN WATER DRAIN
DIRTY WATER DRAIN
CULVERT 9726
CATCHMENT 1 - 6.16 HA 9724
9725
CATCHMENT 2 - 1.04 HA
CATCHMENT 3 - 0.13 HA
CATCHMENT 4 - 0.50 HA
TOTAL - 7.83 HA 9728
1 RL 13.76 AT HEADWALL
9729
9600
RL 13.51 AT HEADWALL
9731
9730
2
9720
9734
DRAINAGE TO BE MODIFIED TO DIVERT
9722
RUNOFF TO CLEAN WATER DRAIN
9721
9604
9700
NEW DRAIN AND PIPE TO TAKE AREA TO BE STABILISED
PAD RUNOFF AND ALLOW
9000
AND BYPASSED TO
OTHER RUNOFF TO BYPASS CLEAN WATER DRAIN
3
4
TOP PAD ESTIMATED AT 5,000m2 MAXIMUM
CLIENT PROJECT
0 50 COPYRIGHT C NOOSA COUNCIL NOOSA LANDFILL - RRA BASIN
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B REVISION FOLLOWING CLIENT COMMENTS KR 29/04/24 SCALE 1:2500 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 16/04/24 CONCEPT DRAINAGE AND BASIN
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 16/04/24 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) CATCHMENT PLAN
A3 THE WRITTEN CONSENT OF TOPO GROUP PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE
NORTH
PTY LTD. CPESC - 5395, RPEQ - 15954 24-0078-C D01 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.