Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
LEGEND:
             CATCHMENT BOUNDARY

             CLEAN WATER DRAIN

             DIRTY WATER DRAIN

             CULVERT                                  9726




CATCHMENT 1 - 6.16 HA                                                      9724




                                                                                                       9725




CATCHMENT 2 - 1.04 HA

CATCHMENT 3 - 0.13 HA

CATCHMENT 4 - 0.50 HA

TOTAL - 7.83 HA                                                                                                      9728
                                                                                                                                                              1                                                                                             RL 13.76 AT HEADWALL


                                                                                                9729




                                                                                                                                                                                                              9600




                                                                                                                                                                             RL 13.51 AT HEADWALL

                                                                    9731
                                                                    9730




                                                                                                                                                                                                                                                        2



                                                                                  9720




                                                                                                                                                                                                                                                                          9734
                                                                                                                                                                                                                                                                                                                   DRAINAGE TO BE MODIFIED TO DIVERT
                                                                                                              9722
                                                                                                                                                                                                                                                                                                                   RUNOFF TO CLEAN WATER DRAIN

                                                                                         9721




                                                             9604
                                                             9700




                                                                                                                                                                                                              NEW DRAIN AND PIPE TO TAKE                                                                                             AREA TO BE STABILISED
                                                                                                                                                                                                              PAD RUNOFF AND ALLOW
                                                                                                                                                                                                                            9000




                                                                                                                                                                                                                                                                                                                                     AND BYPASSED TO
                                                                                                                                                                                                              OTHER RUNOFF TO BYPASS                                                                                                 CLEAN WATER DRAIN


                                                                                                                                                                                                                                                                                     3


                                                                                                                                                                                                                                                  4




                                                                                                                                                                                 TOP PAD ESTIMATED AT 5,000m2 MAXIMUM




                                                                                                                                                                                                                                                               CLIENT                                                PROJECT
                                                                                                                                                       0                    50                                                         COPYRIGHT C                                   NOOSA COUNCIL                                     NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                                                                   TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                               DRAWN                     DESIGNED    DATE            DRAWING TITLE

                             B       REVISION FOLLOWING CLIENT COMMENTS                                                         KR        29/04/24           SCALE 1:2500                                               THIS DOCUMENT MAY NOT BE COPIED OR              KR                      KR      16/04/24                      CONCEPT DRAINAGE AND BASIN
                                                                                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
                             A       ORIGINAL ISSUE                                                                             KR        16/04/24                                                                      MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                               RPEQ / SIGNATURE (IF REQUIRED)                                              CATCHMENT PLAN
                                                                                                                                                                            A3                                          THE WRITTEN CONSENT OF TOPO GROUP                                                            PROJECT No                 DRAWING No          REVISION
                          REVISION   DESCRIPTION                                                                            APPROVED BY   DATE
                                                                                                                                                     NORTH
                                                                                                                                                                                                                                      PTY LTD.                                   CPESC - 5395, RPEQ - 15954                       24-0078-C                  D01         B

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.