Council archive · source document
Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Very large file (19.4 MB): may take a few minutes to open.
FOREBAY LENGTH MAIN CELL LENGTH
LEGEND: LEVEL SPREADER
DECANT SKIMMER
MAXIMUM FROM TOP OF
DRAIN INVERT MIN. CREST MIN. 0.2m
WATER WATER COLUMN
ABOVE SPILLWAY SPILLWAY CREST 12.80
PAD FALL 0.2m ABOVE LEVEL
SPREADER CREST LEVEL
0.3m (MIN)
13.40 13.20 13.00
11.40 EXISTING LEVEL HIGH FLOW
FLOOD LEVELS PROVIDED BY NSC: FLOC SETTLING DEPTH (DF) (OVER
SETTLING ZONE DEPTH (DS) 11.80 - 12.80 SPILLWAY)
Q1 - 12.43
11.42 PROPOSED LEVEL Q2 - 12.44 FREE WATER ZONE (DFF) 11.40 - 11.80 DEPTH (D11.80
T)
SEDIMENT STORAGE DEPTH (DSS) 11.00 - 11.40 11.56
Q10 - 12.51
CLEAN WATER DRAIN Q100 - 12.59 DECANT
LOW FLOW
STRUCTURE
Q100 CC - 12.64 OUTLET
DIRTY WATER DRAIN TYPE A SEDIMENT BASIN TYPICAL SECTION (nts)
11.42
PROPOSED BASIN PROPOSED OUTLET RL 11.56
ALL DRAINS:
- 10% AEP SIZE
11.40 - 0.5% LONG. FALL
- CONCRETE LINED
PROPOSED SPILLWAY RL 12.80 - 1m BASE
- 1 IN 2 SIDE SLOPES
9726
14.15 INVERT
14.80 TOB
13.40 INVERT
14.40 TOB DW3
9724
11.60 DW2
9725
14.25 INVERT
14.70 TOB
13.60
12.00 13.00 14.10
UPSTREAM DRAINAGE
0.5% FALL 14.00 DW4 DIRECTED TO DW4
13.60
EDGE DRAIN AT 0.1% 15.00
14.00
GRADE TO LIMIT FILL
PAD LEVELS ARE INDICATIVE ONLY AND WILL EXISTING DRAINAGE
NEED TO BE REFINED WITH DETAILED DESIGN 14.40 TOO DEEP - NEED TO
0.5% FALL 14.60 INVERT
RAISE DRAINAGE -
9728
DW1 15.05 TOB
13.50 REFER TO SHEET 2
9729
RIDGE 9600
13.50
13.70
14.25
14.10
13.80
9731
9730
13.70
14.50
15.50
14.35 INVERT
14.70 TOB
9720
CLIENT PROJECT
0 30 COPYRIGHT C NOOSA COUNCIL NOOSA LANDFILL - RRA BASIN
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B REVISION FOLLOWING CLIENT COMMENTS KR 29/04/24 SCALE 1:1500 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 16/04/24 CONCEPT DRAINAGE AND BASIN
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 16/04/24 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) CONCEPT DRAINAGE - SHEET 1 OF 2
A3 THE WRITTEN CONSENT OF TOPO GROUP PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE
NORTH
PTY LTD. CPESC - 5395, RPEQ - 15954 24-0078-C D02 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.