Original source · versioned page text
Amended Referral Agency Response - Planning - RAP22 0023 01 (As Published)
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. Infrastructure Charges | Noosa Shire Council
Fires in Urban Areas
3. In urban areas fires are prohibited except where in an appliance is used for domestic
heating or cooking purposes, which must comply with particular standards. Any area
identified as a fire pit area on approved plans is to be in accordance with Local Law &
Subordinate Local Law No. 3, Schedule 3. Refer to the following link for details:
Sustainability
4. Council encourages sustainable and energy efficient building design for all development.
including the use of sustainable building materials, energy efficient fittings, solar hot
water, photovoltaic systems (including the use of inverter/charges), solar panels, water
saving devices and rainwater harvesting.
Qualified Person
5. For the purpose of preparing a Acid Sulphate Soils Management Plant for the
development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Property Driveway and Vehicle Crossover
6. The planning scheme declares the construction of a driveway and vehicle crossover to
the property to be Accepted Development subject to meeting the requirements of the
Low Density Housing Code. If the proposed driveway and vehicle crossover does not
comply with each Acceptable Outcomes contained in the Code, a Development Permit
for Operational Work is required to be obtained from Council.
Building and Construction Industry (Portable Long Service Leave) Levy
7. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Co-ordination of Operational Works Assessment
8. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Works affecting the Revetment Wall
9. Any works that may affect the structural integrity of the revetment wall or extend outside
the property boundary of the subject site must be done so in accordance with an
Operational Works permit for Prescribed Tidal Works, requiring owner’s consent by the
State.
Page 5 of 6
Document Set ID: 24695056
Version: 4, Version Date: 27/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original