Skip to the record
Search everything, all in one place.

Council archive · source document

Sea View Terrace Traffic Management Plan March 2016 · OPW16/0021

From the archive OPW16/0021- Response traffic. File date in the archive: 2016-05-16 04:02.

of 2

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                             HUTCHINSON BUILDERS | Established 1912


    C) Plan Overview per attachments

    1. A MUTCD compliant Traffic & Pedestrian Plan for two phases of construction
    2. Proposed route for heavy vehicles with holding areas designated
    3. Proposed facility for bus parking and traffic control personnel amenities
    4. Proposed facility for transport, day to day car parking, material lay down, accommodation
       and overnight bus parking
    5. Provision for loading and unloading of vehicles within the site

    D) Plan Proposal

The applicant acknowledges the MCU prohibition of workers parking their cars in the streets
surrounding the site. It proposes to manage this by the following:

    1. Establishment of a remote compound and car park on suitable road reserve. (See Off Site
       Parking Plan) The location and suitability of the site has been arrived at in consultation with
       the council’s technical officer, Martin Sergus. The compound will serve to alleviate
       congestion in Seaview Tce resulting from material deliveries by semi- trailer. It will also
       provide lunch and toilet facilities.
    2. A small bus will transport workers to and from the compound and to site.
    3. The bus will be parked in Seaview Tce on road reserve during the day. The location and
       suitability of the parking area has been arrived at in consultation with Martin Sergus. (See
       Bus Parking Plan) Outside of working hours the bus will be parked at the remote compound.

The applicant acknowledges that passageway along end the section of Seaview Tce. is constricted
due to the narrowness of the road, permitted car parking along the western side, and lack of
trafficable verge. The constriction is such that an ill-parked car will prevent truck access. The
applicant proposes to manage this by:

            1. 1 Traffic control in accordance with the MUTCD compliant Traffic & Pedestrian Plan
               attached.
            2. Demarcation of the street parking from the carriageway by means of line marking
               and signage.

    E) Attachments

         Heavy Vehicle Route & Holding Plan
         Compound & Off Site Parking Plan
         Bus Route Plan
         Daytime Bus Parking Plan
         MUTCD compliant Traffic & Pedestrian Plan




M.J.Leeke                                                                                      Page 2

Used in these records

About this file

File size
306 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Sea View Terrace Traffic Management Plan March 2016.pdf · 306 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.