Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix D- SWMP

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (13.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

 29 September 2023


4.7.7 Reporting / Review

Records such as licences, approvals, permits and inspection reports must be reviewed on a regular
basis (e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and
systems are working to prevent contamination.

4.7.8 Corrective Actions

    •     Perform clean-up of any spills immediately.
    •     Any mud or sediment which is tracked onto public roads is to be immediately removed
          using dry clean-up methods i.e. shovel and broom.
    •     Remove or relocate any stockpiles of waste where there is a reasonable risk of erosion and
          sedimentation.
    •     Replace or repair sediment or pollution control devices if they are not maintained in good
          working condition.




 Excellence with Economy in Engineering                                                                18
 https://mpncnetau.sharepoint.com/sites/administration/shared        documents/9000-9999/9900-
 9999/9954/report/29-09-23 stormwater management plan_issue a.docx
Log in to download the original file

Appendix D- SWMP.pdf · 13.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.