Council archive · source document
3983ReconfigReport · REC15/0023
Attached to the e-mail REC15/0023 Development Application - 9 Ravenwood Drive Noosa Heads.
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Specific Outcomes Water supply for fire fighting ROU O13 An adequate and accessible water supply is provided for fire fighting purposes. Existing reticulated water supply provides fire fighting resource. Energy efficiency 014 The street and lot orientation facilitates the construction of energy efficient buildings that respond to the local climate conditions. AND 015 For residential development, the subdivision design provides for the maximum practicable number of lots with house site areas that— a) maximise solar access to the north in winter; b) — minimise solar access to the east and west in the summer; c) maximise access to any prevailing summer breezes; and d) — minimise exposure to prevailing winter winds. The proposed lot layout permits the construction of a house that includes energy efficient features and orientation. Infrastructure 016 Each lot is capable of being serviced by appropriate levels of— a) water supply; b) reticulated sewerage; c) stormwater drainage; d) power supply; and e) — telecommunications; AND 017 The design and provision of public services and utilities, including sewerage, water, electricity, street lighting and telecommunication services— a) meets the needs of users; b) ensures health, safety and convenience of the community; c) protects the natural environmental values of the site and surrounds, including visual amenity and native vegetation; d) are cost effective over their life cycle; e) minimises adverse impacts to the environment (including the amenity of the local area) in the short and long term; and f) ensures that the existing systems are upgraded or relocated to be capable of supporting the proposed development; AND 018 Essential public utilities are available and maintain their function during flood events up to a 1% AEP (1:100 year ARI) flood event. The development has water, sewerage, power and telephone services available. The proposal will note require the extension of the services to the new lots. Electricity supply infrastructure 019 Uses and works maintain a safe distance from electrical infrastructure including substations, overhead power lines, power poles and transformers. Not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3983ReconfigReport.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.