Original source · versioned page text
App B - Swmp
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
LINDSAY CONSULTING PTY LTD- STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED, AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
5. EROSION CONTROL
Any vegetation required to be removed for construction of the proposed development
shall be cleared with the entire root system removed. Grass shall be stripped only as
necessary with the topsoil to remain on site. Topsoil may be stockpiled on site for use
after construction of the residence.
All vegetation stripped from the site shall be removed off site to a council approved
disposal area.
The site shall be provided with a silt fence in accordance with Drawing 24-0771-D1 to
D13.
If any fill material is required to be brought onto site the proposed fill material shall be
assessed to evaluate whether the fill contains acid sulphate material.
Excavation shall be limited to that necessary to carry out construction with batters
constructed to minimise erosion potential.
Site access shall be via the gravel access road to be constructed on site. As detailed on
drawing 24-0771-D1 to D13 a 150 mm CBR 15 gravel access road shall be constructed
on the site.
ALL ACCESS TO THE SITE SHALL BE VIA THIS ACCESS DRIVEWAY.
REF: 240771 4 20 August 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.