Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

App B - Swmp

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

LINDSAY CONSULTING PTY LTD- STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED, AS TRUSTEE FOR THE LINDSAY FAMILY TRUST


        6.         WASTE MANAGEMENT


                   All waste from the site shall be collected in a waste skip or a fence off area specifically
                   set-aside for waste disposal. If a fenced off area is utilised then access to the enclosure
                   via a bobcat shall be available.


        7.         WORKING HOURS


                   Working hours for the duration of the construction period shall be as per Sunshine Coast
                   Regional Council guidelines or as set out in the town planning requirements.


On and Behalf of
LINDSAY CONSULTING PTY LTD RPECQ 391


Jason Lindsay
RPEQ




REF: 240771                                              5                          20 August 2025
Log in to download the original file

APP B - SWMP.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.