Original source · versioned page text
Minor Change Report - MCU17 0568 02 & OPW17 0602 02 (As Published)
• Operational Works (Earthworks, Stormwater Drainage, Vehicle Crossovers, Parking, Erosion
& Sediment Control and Landscaping)
In particular the applicant is seeking to align the approval with the current as-built site configuration
and parking arrangement and includes the following changes:
• The approved display village has been removed from the proposal.
• The approved drying shed has been removed from the proposal.
• The car parking layout has been amended to provide (15 Spaces including one disabled
space)
• The approved loading bays are now open on three sides and therefore no longer contribute
to GFA.
• The overall GFA has been reduced to 708.1m2.
The locality and proposal plan are included below.
Figure 1 – Locality
Page 2 of 9
Document Set ID: 24936711
Version: 4, Version Date: 29/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.