PHASE 1 - BULK EARTHWORKS
· SILT FENCES TO BE INSTALLED, EXTENDED AND MOVED AS
NECESSARY TO PROTECT THE WATER WAY.
· BATTERS TO BE TURFED AS SOON AS POSSIBLE ONCE FINAL
SLOPE IS CUT AND TOPSOILED.
· SITE ENTRIES/EXITS TO BE INSTALLED, ROADS TO BE SWEPT
WHEN NECESSARY TO MAINTAIN A CLEAN ROAD SURFACE.
MANAGEMENT OF DUST, EROSION AND
SEDIMENT IS THE RESPONSIBILITY OF THE
EARTHWORKS CONTRACTOR.
THEY ARE TO PREPARE PHASE SPECIFIC EROSION
CONTROL PLANS AND SUBMIT TO THE
MANAGING CONTRACTOR PRIOR TO BEGINNING
WORK ON THE RELEVANT PHASE.
10.60
10. 50
10.40
POINCIANA AVENUE
0
10.3
0
0
10.2
RP845244
10
10.
10.10
0 1
0. 1
00 .
10
10.00
10.00
9.90
9.80
9.8
0
9.80
9.10
9.70
9.60
9.50
9.40
9.30
9.20
9.10
9.00
8.90
8.80
8.70
8.5 0
8.6
8.400
3
RP40197
10.90
10.70
10.60
10.80
10.50
10.30
10.20
10.40
10.10
BLAKESELY STREET
.00
19.090
9.80
9.70
9.60
9.10
0
9.5
0
9.4
0
9.3
0
9.2
0
9.1
0
9.0
0
8.9
0
8.70
8.8
8.60
8.50
00
0
8.4
8.30
8.20
9.
8.20
0
8.9
THIS DRAWING IS BEST
0
8.8
VIEWED IN COLOUR AND
10.60
10.50
10.30
10.10
10.40
10.20
10.00
9.90
9.80
ON AN ELECTRONIC DEVICE
0
8.7
9.70
9.60
9.50
9.40
9.30 0 PROJECT NORTH
9.2 8.60
0 8.50
9.1 8.40
0
9.0
0
8.9 8.3
0
0
8.8
0
8.7 8.60 8.10
8.50 8.20
8.10
SITE WORKS AREA ENTRY AND EXIT. DIMENSIONS IN METRES EXCEPT WHERE A1 UNREDUCED
SEDIMENT TRAP TO BE MAINTAINED AT ALL
J:\2023\23169\05_DRAWINGS\DRG\C0210.DWG
SHOWN OTHERWISE. CULVERT AND PIPE
SIZES IN MILLIMETRES A3 REDUCED
TIMES AND RELOCATED AS REQUIRED TO
SUIT CONSTRUCTION PHASING. SCALES UNREDUCED / REDUCED
CHANGE THIS FIELD WHEN --->
5
DIYAN STREET
APPLYING TO A NEW --->
0 2 4 6 8 10 m VIEWPORT (OBJECT) --->
1:200 / 1:400
PLAN STATUS
SCALE 200
FOR APPROVAL
DWN DES CHK APP CLIENT PROJECT SUBJECT PROJECT No.
SCAN QR CODE TO
REV DATE DESCRIPTION
ASSOCIATED CONSULTANTS APPROVED CHECKED
11/04/2025 3:40:41 PM
C 10.04.25 ISSUE FOR OPERATIONAL WORKS APPROVAL AR KHN SG NR QUEENSLAND VENUE 120 POINCIANA AVE, EROSION & SEDIMENT 23169
CONFIRM CURRENT B 04.02.25 IFC PART 1 AR KHN SG NR
COMPANY PTY LTD TEWANTIN, QLD CONTROL PHASE 1 DRAWING No. REVISION
DRAWING REVISION A 17.10.24 ISSUE FOR CO-ORDINATION AR KHN SG
http://docs.bornhorstward.com.au/revision/ ---- ---- C0210 C
DATE 11/04/25 DATE 11/04/25
COPYRIGHT © - This document is and shall remain the property of Bornhorst & Ward Pty. Ltd. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement. Unauthorised use of this document in any form whatsoever is prohibited.
0 10 20 30 40 50 100 ORIGINAL SIZE A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.