Skip to the record
Accept no imitations.

Original source · versioned page text

Combined_Civil_Drawings_-_Royal_Mail_Hotel

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                                                                                                                                                                                       5.0
        EROSION & SEDIMENTATION CONTROL NOTES                                                                                                                                        CONSTRUCTION SITE
                                                                                                                                                                                                                                                      MI m                            CATTLE GRID 3.0m NOM
                                                                                                                                                                                                                                                        N                             WIDTH SET 300mm
        1.           GENERAL




                                                                                                                                                                                                NOM
                                                                                                                                                                                                100
                                                                                                                                                                                                                                                                                      ABOVE GROUND
         1.0.          REFER IECA (AUST) VOLUME 2 FOR TYPICAL CONSTRUCTION PHASE CONTROLS
         2.          TOPSOIL
                                                                                                                                                                                                                                                                                                 10                     TY
         2.0.        STRIP & STOCKPILE AVAILABLE TOPSOIL (ASSUMED AVERAGE DEPTH 150mm)                                                                                                                                                                                                              .0
                                                                                                                                                                                                                                                                                                 MI m               P ER NT
                                                                                                                                                                                                                                                                                                                  O
                     FROM DISTURBED AREAS PRIOR TO BULK EARTHWORKS. GRADE BULK                                                                                                                                                                                                                     N            PR NME
                                                                                                                                                                                                                                                                                                                    G
                     EARTHWORKS SURFACE LEVEL EVENLY TO ENSURE SITE IS FREE DRAINING.                                                                               GEOTEXTILE FABRIC,                                                                                                                          ALI
         2.1.        MINIMUM SLOPE ACROSS SITE TO BE 0.5%.                                                                                                      BIDUM U34 OR SIMILAR.




                                                                                                                                                                                                                     300
         2.2.        ALL FOOTPATHS, BATTERS & EARTHWORKS AFFECTED AREAS ARE TO BE
                                                                                                                                                                                                                                                                                    m                                                 SANDBAGS OVERLAP
                     TOPSOILED TO A MINIMUM DEPTH OF 100mm (LIGHTLY COMPACTED) & TURFED                                                                                                                                                                                          3.0 IN                                                     ONTO KERB                               4.0m MIN
                     WHERE SPECIFIED.                                                                                                                                                                                                                                              M                                                                                                                                                            BIDM WRAPPED
         2.3.        SEDIMENT FENCES TO BE PLACED AS SHOWN. SEDIMENT FENCES TO BE                                                                                                                                                                                                                                                                                                                                                             SOCK TO BE FILLED
                                                                                                                                                                                               RUNOFF FROM PAD




                                                                                                                                                                                                                                                                                                                                                         1.5
                     REPAIRED & EXCESSIVE SEDIMENT DEPOSITS SHALL BE REMOVED ONCE                                                                                                                                                                                                                                                                                                                                                                 WITH GRAVEL
                                                                                                                                                                                             DIRECTED TO SEDIMENT




                                                                                                                                                                                                                                                                                                                                                             0M
                     CAPACITY FALLS BELOW 75%
                                                                                                                                                                                                     TRAP.
         3.          SEDIMENT FENCES




                                                                                                                                                                                                                                                                                                                                                              IN
                                                                                                                                                                                                                                                                                                                                       RUNOFF
         3.1.        SEDIMENT FENCES TO BE REPAIRED AS REQUIRED & EXCESSIVE SEDIMENT
                     DEPOSITS SHOULD BE REMOVED.                                                                                                                                                                                                                                                                                                                                                              BYPASS FLOW TO INLET
                                                                                                                                                                                                                     NOTE 1: UNBOUND PAVEMENT MATERIAL                                                                            0.60m NOM GAP BETWEEN                                                                                       RUNOFF
         3.2.        IN THE EVENT OF WET WEATHER, INSTALL KERB INLETS FILTER WITH GRAVEL
                                                                                                                                                                                                                     (GRAVEL) TO GRADING B, TABLE 9 OF                                                                                BAGS ACT AS SPILLWAY                                                                                                               GRATE TO BE
                     RANGING FROM 50mm TO 75mm IN SIZE. IF THE GRAVEL FILTER BECOMES
                                                                                                                                                                                                                     TMR SPECIFICATION MRS11.05, EXCLUDE                                                                                                                                                                                                                 LINED WITH
                     CLOGGED WITH SEDIMENT DURING ITS USE, THE GRAVEL MUST BE PULLED                                                                                                                                 MATERIAL FINER THAN AS SIEVE 2.36mm.                                                                                                                                THREE LAYERS OF SANDBAGS
                                                                                                                                                                                                                                                                                                                                                                                         WITH ENDS OVERLAPPED.                                                           GEOFABRIC.
                     AWAY FROM THE MESH & CLEANED OR REPLACED.
         3.3.        REGULAR WEEKLY CHECKS OF SILT FENCES IS TO BE MADE ALONG WITH A CHECK
                     AFTER ANY SIGNIFICANT STORM EVENT TO ENSURE INTEGRITY &
                                                                                                                                                                                                                                                                                                                                                                                                                                                    ON GRADE KERB INLET SEDIMENT
                     PERFORMANCE.                                                                                                                                                                                 TEMPORARY CONSTRUCTION                                                                                                  ON GRADE KERB INLET SEDIMENT TRAP                                                                         TRAP ON EXISTING ROADS
                                                                                                                                                                                                                                                                                                                                          N.T.S                                                                                                      N.T.S.
         4.          TURFING                                                                                                                                                                                      ENTRY / EXIT SEDIMENT TRAP
         4.1.        PROVIDE TURFING TO ENTIRE WIDTH OF ALL SWALES, FOOTPATHS & 1 in 4 CUT                                                                                                                        N.T.S
                     & FILL BATTERS.
         4.2.        FOOTPATH BATTERS ARE TO BE STABILISED WITH TOPSOIL (& TURFED) AS SOON
                     AS PRACTICAL AFTER THE BATTERS HAVE BEEN COMPLETED. REMAINING
                     EXPOSED AREAS ON LOTS ARE TO BE SEEDED & MULCHED (EG. HYDROMULCH).
                                                                                                                                                                                                                                                          00
         5.          DURING CONSTRUCTION SEQUENCE                                                                                                                                                                                                       30 X
                                                                                                                                                                                            SL42 FABRIC TO AS 1304                                       MA
         5.1.        TOPSOIL STOCKPILE SITE TO HAVE A SEDIMENTATION FENCE CONSTRUCTED ON                                                                                                            DISTURBED AREA
                     DOWNSTREAM SIDE.                                                                                                                                                        DIR                                                                                                                                                                                                         "RETURNS" PLACED AT 20m MAXIMUM SPACING
         5.2.        SEDIMENTATION FENCES TO BE PLACED AS SHOWN.                                                                                                                                 EC                                                                                                                                                                                                      IF FENCE IS LOCATED ALONG THE CONTOUR,
                                                                                                                                                                                                    TIO
         5.3.        REGULARLY INSPECT BANKS & REPAIR ANY SLUMPS, WHEEL TRACK DAMAGE OR                                                                                                                NO                                                                                                                                                                                                OTHERWISE 5 to 10m DEPENDING ON SLOPE
                                                                                                                                                                                                          FF
                     LOSS OF FREEBOARD                                                                                                                                                                       LO
                                                                                                                                                                                                                W
         5.4.        REMOVE SEDIMENT TO AVOID PONDING FROM CATCH DRAINS                                                                                                                                                                                                                GEOTEXTILE FABRIC
         5.5.        REMOVE EXCESSIVE SEDIMENT FROM UPSTREAM OF CHECK DAM.
                                                                                                                                                                                                                                                                                  POSTS OR STEEL PICKETS                                  DIR
         5.6.        ROAD RESERVE TO BE USED AS HAUL ROAD                                                                                                                                                                                                                         DRIVEN 600mm INTO GROUND                                      EC                                                  .
                                                                                                                                                                                                                                                                                                                                                     TIO
                                                                                                                                                                                                        600 MAX

         5.7.        A CATCH DRAIN BANK IS TO BE PROVIDED ON THE TOP SIDE OF ALL CUTS &                                                                                                                                                                                                                                                                  N   OF
                     DISCHARGED EITHER TO UNDISTURBED GRASS LANDS OR TO THE CROSS ROAD                                                                                                                                                                        100 MIN VERTICAL OVERLAP OF                                                                         FLO
                                                                                                                                                                                                                                                                                                                                                                     W                                                                             1.5m MINIMUM
                     DRAINAGE                                                                                                                                                                                                                                 FABRIC UNDISTURBED AREA
         5.8.        SUPPLEMENTARY EROSION & SEDIMENT CONTROL DEVICE MAY BE REQUIRED
                     AT THE DISCRETION OF THE ENGINEER                                                                                                                                                                             BACKFILL
         5.9.        CONSTRUCTION EXIT SHALL BE AT ONLY ONE NOMINATED POINT ON DIYAN
                     STREET . REFER TYPICAL DETAIL
                                                                                                                                                                                                        200




         5.10.       WATER QUALITY SAMPLES MUST BE TAKEN & ANALYSED PRIOR TO RELEASE OF
                     ANY WATER FROM THE SEDIMENT POND. WATER QUALITY MUST SATISFY THE                                                                                                                                       SILT FENCE ELEVATION
                     FOLLOWING CRITERIA:TSS<50MG/L PH BETWEEN 6.5 & 8.5. IF WATER QUALITY                                                                                                                                   N.T.S.
                     FAILS THE CRITERIA THEN THE USE OF A GYPSUM FLOCCULENT IS TO BE APPLIED
                     AS DIRECTED BY THE MANAGING CONTRACTOR OR CONSULTING ENGINEER.
         5.11.       ALL WATER QUALITY DATA INCLUDING DATES OF RAINFALL, TESTING & WATER
                     RELEASE MUST BE MAINTAINED IN AN ON-SITE REGISTER. THIS REGISTER IS TO                                                                                                    1.2m WIDE TURF STRIP TO BE PLACED
                     BE MAINTAINED FOR THE DURATION OF THE APPROVED WORKS & BE                                                                                                                   BEHIND ALL KERB & CHANNEL TURF                                                                                                                                                                                                                                    GEOFABRIC UNDER
                     AVAILABLE ON SITE FOR INSPECTION ON REQUEST.                                                                                                                                TO BE PLACED FOR FULL FOOTPATH                                                                                                                               SILT FENCE RETURNS                                                                                   FIELD INLET GRATE
         5.12.       GRASS SEEDING/HYDRO MULCH IS TO ACHIEVE 70% COVER WITHIN 30 DAYS OF                                                                                                       WIDTH WHERE INDICATED ON PLAN.                                                                                                                                 N.T.S
                     COMPLETION OF EARTHWORKS. HYDRO MULCH IS A DESIGN AND CONSTRUCT
                     SPECIFICATION BY THE SUPPLIER.
         6.          FOLLOWING CONSTRUCTION
         6.1.        SEDIMENTATION FENCES TO BE MAINTAINED UNTIL TURFING IS COMPLETED &
                     GRASS IS 80% ESTABLISHED.
                                                                                                                                                                                                                                                                                       FOOTPATH PROFILE TO BE TRIMMED
         6.2.        SEDIMENT BASINS TO BE CHECKED & DE-SILTED AFTER EVERY SIGNIFICANT
                     STORM EVENT OR IN THE CASE OF NO SIGNIFICANT STORM EVENT, EVERY 12
                                                                                                                                                                                                                                                                                       TO BE 50mm BELOW TOP OF KERB &
                                                                                                                                                                                                                                                                                       CHANNEL TO ALLOW PLACEMENT OF
                                                                                                                                                                                                                                                                                                                                                                                                                                     FIELD INLET SEDIMENT TRAP: GEOFABRIC
                                                                                                                                                                                                                                                                                                                                                                                                                                     N.T.S.
                     WEEKS .                                                                                                                                                                                                                                                           TURF STRIP.
                                                                                                                                                                                                                                                                                                                                                                                SAND BAGS
                                                                                                                                                                                                                                                                                                                                                                                                 INLET WITH GRATE
        NOTE:
         NOT WITHSTANDING THE DETAILS ON THESE DRAWINGS THE CONTRACTOR IS                                                                                                                            EROSION CONTROL AT KERB
         ULTIMATELY RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL WITHIN THE                                                                                                                          N.T.S.
         SITE. THE CONTRACTOR SHALL COMPLETE ALL DESIGN MEASURES AND MORE AS
         ANY ADDITIONAL MEASURES AND MAINTENANCE REQUIRED TO SUIT THEIR                                                                                                                                                                                                                                                                                                                             GEOTEXTILE MATERIAL(BIDIM
         CONSTRUCTION STAGING. ALL COSTS IN RELATION TO EROSION AND SEDIMENT                                                                                                                                                                                                                                                                                                                        A34 OR EQUIVALENT)
         CONTROL ARE TO BE INCLUDED IN THE LUMP SUM.



                                                                                                                                                                                                                                                                                                                                       RUNOFF WATER                     SAND BAGS
                                                                                                                                                                                                                                                                                                                                                                                                        FILTERED WATER


                                                                                                                                                                                                                                                                                                                                                                                                           GEOTEXTILE MATERIAL(BIDIM
                                                                                                                                                                                                                                                                                                                                         SEDIMENT                                                          A34 OR EQUIVALENT)
                                                                                                                                                                                                                                                                                                                                                                                               FIELD INLET WITH GRATE


                  MANAGEMENT OF DUST, EROSION AND




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          J:\2023\23169\05_DRAWINGS\DRG\C0200.DWG
                  SEDIMENT IS THE RESPONSIBILITY OF THE
                  EARTHWORKS CONTRACTOR.                                                                                                                                                                                                                                                                                                         FIELD INLET SEDIMENT TRAP
                                                                                                                                                                                                                                                                                                                                                     N.T.S.
                  THEY ARE TO PREPARE PHASE SPECIFIC EROSION                                                                                                                                                                                                                                                                                                                                                                                                                                                                   THIS DRAWING IS BEST
                  CONTROL PLANS AND SUBMIT TO THE                                                                                                                                                                                                                                                                                                                                                                                                                                                                             VIEWED IN COLOUR AND
                  MANAGING CONTRACTOR PRIOR TO BEGINNING                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ON AN ELECTRONIC DEVICE
                  WORK ON THE RELEVANT PHASE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STATUS


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  FOR APPROVAL
                                                                                                                                                                                               DWN       DES       CHK       APP                                                                                                                                                                           CLIENT                                      PROJECT                             SUBJECT                                       PROJECT No.
    SCAN QR CODE TO
                                                                                     REV         DATE         DESCRIPTION
                                                                                                                                                                                                                                        ASSOCIATED CONSULTANTS                                           APPROVED              CHECKED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          11/04/2025 3:40:39 PM
                                                                                       C      10.04.25         ISSUE FOR OPERATIONAL WORKS APPROVAL                                            AR       KHN        SG       NR                                                                                                                                                                             QUEENSLAND VENUE                            120 POINCIANA AVE,                  EROSION & SEDIMENT                             23169
    CONFIRM CURRENT                                                                    B      04.02.25         IFC PART 1                                                                      AR       KHN        SG       NR
                                                                                                                                                                                                                                                                                                                                                                                                           COMPANY PTY LTD                             TEWANTIN, QLD                       CONTROL NOTES AND                             DRAWING No.        REVISION
    DRAWING REVISION                                                                   A      17.10.24         ISSUE FOR CO-ORDINATION                                                         AR       KHN        SG
    http://docs.bornhorstward.com.au/revision/                                                                                                                                                                                                                                                                                                                                                             ----                                        ----                                DETAILS                                        C0200                 C
                                                                                                                                                                                                                                                                                                     DATE 11/04/25            DATE 11/04/25
COPYRIGHT © - This document is and shall remain the property of Bornhorst & Ward Pty. Ltd. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement. Unauthorised use of this document in any form whatsoever is prohibited.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       0       10    20   30     40     50                 100         ORIGINAL SIZE A1
Log in to download the original file

Combined_Civil_Drawings_-_Royal_Mail_Hotel.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.