Original source · versioned page text
Annex 10 - Code 8 - Coastal Development & Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Performance outcomes Acceptable outcomes Response
1. are used for marine access purposes only The development is not private marine development.
2. minimise the use of state coastal land
3. do not interfere with access between navigable
waterways and adjacent properties.
PO15 Development ensures erosion control structures are No acceptable outcome is prescribed. Not applicable
located within the premises they are intended to protect
While the works may have erosion control benefits,
unless there is no feasible alternative.
they are not primarily for the purpose of controlling
erosion. The objective is to restore oyster-dominated
ecosystems to the Noosa River estuary. Site
selection has been based on Habitat Suitability
parameters and Restoration suitability parameters.
Matters of state environmental significance
PO16 Development: No acceptable outcome is prescribed. Complies with PO16
1. avoids impacts on matters of state environmental
significance; or Matters of State environmental significance (MSES) -
2. minimises and mitigates impacts on matters of Tewantin
state environmental significance after • High Ecological Value Waters (wetland)
demonstrating avoidance is not reasonably
possible; and • High Ecological Significance Wetlands
3. provides an offset if, after demonstrating all • Noosa River Declared Fish Habitat (A) Area
reasonable avoidance, minimisation and mitigation
measures are undertaken, the development results High Ecological Value (HEV) Waters (wetland) / High
in an acceptable significant residual impact on a Ecological Significance (HES) Wetlands
matter of state environmental significance.
The oyster ecosystem restoration works are designed to
Statutory note: For Brisbane core port land, an offset may enhance the values of the wetland by restoring a complex
only be applied to development on land identified as E1 ecosystem to what is currently a degraded aquatic
Conservation/Buffer, E2 Open Space or Buffer/Investigation environment.
in the Brisbane Port LUP precinct plan. For the Brisbane
Port LUP, see www.portbris.com.au. Mangroves and seagrasses are not within the footprint of
this project and will not be impacted.
Note: Guidance for determining if the development will have
a significant residual impact on the matter of state A small stand of mangroves is shoreward of the proposed
environmental significance is provided in the Significant restoration footprint. Mangrove areal roots extend into the
State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works Page 11 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.