Annex 10 - Code 8 - Coastal Development & Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 20

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                         Acceptable outcomes                    Response
                                                                                                      monitoring of sensitive receptors is to be undertaken.
                                                                                                      Detailed requirements are outlined in ICM drawing
                                                                                                      NROR-2021-02 and section 6.4 of the Project
                                                                                                      Restoration Plan.

                                                                                                      Pre and post construction, the restoration sites will be
                                                                                                      monitored for water quality (pH, dissolved oxygen,
                                                                                                      temperature, total suspended solids) in line with
                                                                                                      Queensland Water Quality Monitoring Guidelines for
                                                                                                      the Noosa Lower Estuary (Area NLE1 – Noosa lower
                                                                                                      estuary).
  Category C and R areas of vegetation
  PO12 Development:                                            No acceptable outcome is prescribed.   Complies with PO12
     1. avoids impacts on category C areas of vegetation                                              Vegetation in category C areas and category R areas
         and category R areas of vegetation; or                                                       will be avoided.
     2. minimises and mitigates impacts on category C
         areas of vegetation and category R areas of
         vegetation after demonstrating avoidance is not
         reasonably possible.
  Public use of and access to state coastal land
  PO13 Development maintains or enhances public use of         No acceptable outcome is prescribed.   Complies with PO13
  and access to and along state coastal land (except where
                                                                                                      The design provides for a minimum distance of 10m
  this is contrary to the protection of coastal resources or
  public safety).                                                                                     from foreshore access to maintain public use of and
                                                                                                      access to and along state coastal land. Refer ICM
                                                                                                      drawing NROR-2021-00.
                                                                                                      At the Tewantin site (ICM drawing NROR-2021-04)
                                                                                                      upstream of the boat ramp, there is an opening in the
                                                                                                      vegetation that could provide public access to the
                                                                                                      structure if desirable. In this location a wider 4m
                                                                                                      access gap has been provided between shoreward
                                                                                                      reef patches to facilitate safe access by a larger
                                                                                                      number of persons if this was desirable (e.g. for
                                                                                                      education purposes).
  PO14 Private marine development ensures that works:          No acceptable outcome is prescribed.   Not applicable

State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works                                                                                     Page 10 of 20
Log in to download the original file

Annex 10 - Code 8 - Coastal Development & Tidal Works.pdf · 223 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.