Annex 10 - Code 8 - Coastal Development & Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Performance outcomes Acceptable outcomes Response
2. ensuring imported sand is compatible with natural
beach sediments and coastal processes of the
receiving beach.
PO9 Erosion control structures are only constructed where No acceptable outcome is prescribed. Not applicable
there is an imminent threat to buildings or infrastructure of
While the works may have erosion control benefits,
value, and there is no feasible option for either:
they are not primarily for the purpose of controlling
1. beach nourishment; or erosion. The objective is to restore oyster-dominated
2. relocation or abandonment of structures. ecosystems to the Noosa River estuary.
Statutory Note: The monetary value of buildings or
infrastructure should be more than the cost of associated
erosion control structures.
PO10 Erosion control structures minimise interference with No acceptable outcome is prescribed. Not applicable
coastal processes, or any increase to the severity of erosion
While the works may have erosion control benefits,
on adjacent land by:
they are not primarily for the purpose of controlling
1. locating the erosion control structure as far erosion. The objective is to restore oyster-dominated
landward as practicable and directly adjacent to
the structure it is intended to protect
ecosystems to the Noosa River estuary.
2. where required and feasible, importing sand to the
site to mitigate any increase in the severity of
erosion
3. the design of the structure.
Water quality
PO11 Development: No acceptable outcome is prescribed. Complies with PO11 (subject to monitoring)
1. maintains or enhances environmental values of
receiving waters
As oysters are filter feeders, the works would be
2. achieves the water quality objectives of expected to result in improved water quality outcomes
Queensland waters
for the Noosa River.
3. avoids the release of prescribed water
contaminants to tidal waters.
Note: See Environmental Protection (Water) Policy 2009 for During construction, rock placement activities may
the relevant water quality objectives. result in some suspension of sediment. Construction
materials are to be clean, uncontaminated and free of
topsoil or organic material. Construction is to be
managed to minimise potential for impacts and
State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works Page 9 of 20