Appendix B - SWMP, Flood Cert & Form 15
Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives
A site-specific erosion and sediment control plan shall be prepared as part of a future
submission for Operational Works approval. Suitable erosion and sediment controls for the
site may include:
1. Sediment fencing along all downstream boundaries of the site to capture sediment
from leaving the site.
2. A shakedown area is to be installed at the construction entry/exit to the site to
minimise sediment being transported to and from the site.
3. Ensuring stockpiles and construction materials are contained using sediment
fencing downstream of these areas.
4. Turfed diversion swales may be provided at upstream boundaries to divert surface
run-off around exposed earthwork areas.
4. 2. O P E R A T I O N A L P H A S E
The development is to comply with the Noosa Council Water Quality and Drainage Code,
AO6.2 which states:
Page 9 of 22
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.