Appendix B - SWMP, Flood Cert & Form 15
Table 3.2 Existing and proposed mitigated site peak discharge rates
53 Doonella Street 55 Doonella Street Total
A.E.P Qexisting Qproposed Qchange Qexisting Qproposed Qchange Qchange
(m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s)
63.20% 0.009 0.010 0.001 0.012 0.011 -0.001 0.000
50% 0.010 0.011 0.001 0.013 0.012 -0.001 0.000
20% 0.014 0.013 -0.001 0.019 0.015 -0.004 -0.005
10% 0.017 0.015 -0.002 0.022 0.017 -0.005 -0.007
5% 0.020 0.016 -0.004 0.026 0.018 -0.008 -0.012
2% 0.024 0.018 -0.006 0.030 0.020 -0.010 -0.016
1% 0.026 0.023 -0.003 0.034 0.027 -0.007 -0.010
As the total peak flows are equal to or below the existing site conditions, the development
suitably controls the peak flow storm events from the development.
4. STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction
and operational phase of the development. Refer to Appendix A Proposed Development
Plans for the proposed stormwater drainage layout plan.
4. 1. C O N S T R U C T I O N P H A S E
4.1.1 Erosion and Sediment Control Measures
During construction, it will be necessary to manage stormwater run-off to avoid potential
contamination of downstream waterways from sediments and other pollutants from the site.
Best practice erosion and sediment controls shall be installed to minimise the discharge of
potential contaminants from the site, in accordance with the objectives of Appendix 2 of the
SPP (DERM, July 2017) shown below in Figure 4.1.
Page 8 of 22
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.