Appendix B - SWMP, Flood Cert & Form 15
Figure 4.2 - Rainfall run-off parameters for SEQ
The source nodes have been created using a split catchment approach, with the roof,
driveway and other ground areas separated with stochastic pollutant generation for each
of the surface types as per Table 4.1 - Urban Residential Split Node Pollutant Generation
Parameters. The area and impervious fractions for each catchment are actual values based
on the design plans.
Table 4.1 - Urban Residential Split Node Pollutant Generation Parameters
Flow Type Surface TSS LOG¹º TP LOG¹º VALUES TN LOG¹º VALUES
Type Mean St. Dev Mean St. Dev Mean St. Dev
Baseflow Roof N/A N/A N/A N/A N/A N/A
Driveway 1.00 0.34 -0.97 0.31 0.20 0.20
Ground 1.00 0.34 -0.97 0.31 0.20 0.20
Stormflow Roof 1.30 0.39 -0.89 0.31 0.26 0.23
Driveway 2.43 0.39 -0.30 0.31 0.26 0.23
Ground 2.18 0.39 -0.47 0.31 0.26 0.23
The proposed treatment train has been modelled as shown in Figure 4.3 - MUSIC
Stormwater Treatment Train. The details of the treatments are described in the following
sections
Figure 4.3 - MUSIC Stormwater Treatment Train
4.2.1.1. Rainwater Tanks
The rainwater tanks connected to the source nodes representing their drained catchments.
Each of the tanks to be provided is modelled as a 3kL storage volume, with 1.5kL allocated
for re-use (assumed to be full at beginning of the modelling) and the remaining portion
being for attenuation capacity.
Page 11 of 22
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.