Original source · versioned page text
Appendix B - SWMP, Flood Cert & Form 15
Figure 4.8 - Ocean Guard Gross Pollutant Removal Efficiency
4.2.1.1. Bioretention Areas
Two 6m² bioretention areas are to be provided within each property to capture and treat
surface run-off from the driveways as well as overflows from attenuation tanks. The
bioretention areas are modelled in accordance with the Water by Design MUSIC Guidelines
2018 with the node configuration for one of the areas shown below in Figure 4.9 –
Bioretention Node details.
Figure 4.9 – Bioretention Node details
Table 4.2 – Bioretention Area Plantings below (based on the Brisbane City Council Water
Sensitive Urban Design Engineering Guidelines) presents a sample of suitable plants that
shall be used to provide effective nutrient removal in the bioretention areas.
Page 14 of 22
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.