Original source · versioned page text
Appendix B - SWMP, Flood Cert & Form 15
The litter baskets shall be maintained in accordance with the manufacturer’s specifications.
Refer to Appendix B Ocean Protect Ocean Guard Litter Basket for further details.
The bioretention areas shall be maintained following a schedule of routine inspections
undertaken after every significant rainfall event (30mm of rainfall in a 24-hour period) or on
a three-monthly basis within the first twelve months and on a six-monthly basis thereafter.
The inspection shall ensure the proper functioning and condition of the bioretention area
and ensure that the planting and vegetation health is suitably maintained. An inspection
checklist from the Healthy Waterways Technical Design Guidelines for Southeast
Queensland has been provided in Appendix C Bioretention Inspection Checklist that
provides the structure for the inspections to be undertaken.
In addition to regular inspections, the first 4 months of establishment of the bioretention
areas requires a watering frequency of:
i. Week 1 - 6: 5 times per week
ii. Week 6-10: 3 times per week
iii. Week 11-15: 2 times per week
After 5 months, watering frequency shall be adjusted based on the local conditions to
ensure plants are maintained in a healthy state.
Page 17 of 22
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.