                                         RECONFIGURATION OF A LOT CONDITIONS
               1.     The lot reconfiguration shall generally be in accordance with Lawrence & Partners Consulting
                      Surveyors plan number 5696-S1 except as modified herein.
               2.     Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period is four
                      (4) years from the day this permit takes effect during which time all conditions must have
                      been complied with, operational works completed, and the Plan of Survey lodged with the
                      Council for endorsement.
               3.     In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
                      documentation shall be presented to Council and shall be submitted in the correct form with
                      the fees prescribed in Council's adopted fee schedule.
               4.     Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
                      due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior
                      to endorsement of the Plan of Survey.
               5.     A contribution toward the provision of beach access shall be paid in accordance with
                      Council’s Planning Scheme Policy PSP 4 on Beach Access Contributions prior the issue of
                      a Development Permit for Building Works. The amount of the contribution shall be calculated
                      at the rate current at the date of payment. An estimate only of the contribution rate as of July
                      94 was $65 per unit.
               6.     A contribution in accordance with Planning Scheme Policy PSP 24 for Park Requirements
                      on Subdivision Applications in lieu of dedication of land shall be paid to Council prior to its
                      endorsement of the Plan of Survey. The amount of the contribution shall be calculated at the
                      rate current at the date of payment. An estimate only of the contribution rate as of August
                      2000 was $2,700 per additional lot. Contributions will be used for providing park facilities in
                      the nearest town.
               7.     Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required
                      Grant of Easement shall be submitted to Council for perusal.
                      Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan
                      of Survey.
                      Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
                      the endorsing of the Plan of Survey.
               8.     The site shall be connected to Council’s Water Supply and Sewerage reticulation systems in
                      accordance with the Water and Sewerage design guidelines at no cost to Council.
               9.     A programme of works is to be submitted with any application for any Development Permit
                      for Operational Works detailing the construction schedule and proposed environmental
                      protection measures.
                      Where the program is changed for any reason whatsoever, a copy of the revised program
                      shall be submitted to Council’s Works Inspector within seven (7) days.
               10.    Operational works shall be carried out in a manner that prevents:-
                      Pollution of a waterway.
                      Dust/sand nuisance to residents in the vicinity.
                      Transfer of dirt and debris onto a public road
                      Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries).
                      Excessive traffic delays (less than 5 minute delays).
                      Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of
                      construction equipment etc.).




                                                                                                        Page 5 of 8
Document Set ID: 25270716
Version: 4, Version Date: 27/10/2026

Used in these records

About this file

File size
170 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132000.200176.1 (As Published).pdf · 170 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.