11. All designs for engineering works involving the construction of pavements, kerb and channel,
vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
reticulation shall be prepared in accordance with the requirements of Council's Engineering
Design Standards, shall reference where applicable to Council’s Standard Drawings and
shall incorporate best engineering practice.
12. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
13. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with
any Development Permit for Operational Works. Site control measures such as silt fencing,
controlled gravel access to the site and controlled disposal of waste, may be necessary.
All physical site control measures shall be installed and maintained until all operational works
have been completed and accepted on maintenance. The erosion and sediment control plan
must be adhered to at all times.
Prior to commencement of operational works a $2000 site control bond is required to be
lodged with Council to ensure compliance with this condition. The bond will be refunded less
any costs incurred by Council in ensuring compliance with this condition or any additional
inspections incurred for substandard work or work undertaken not in accordance with this
permit. The security will be returned upon satisfactory performance of all the conditions of
this permit and any other related development permits for operational works, less any costs
incurred by Council in ensuring compliance with these conditions or for any additional
inspections incurred for substandard work or work undertaken not in accordance with this
permit.
14. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units including leased buildings are served by a single
service, multiple water meters to each individual unit or leased building shall be installed. All
fees for the supply of water meters shall be paid to the Council.
15. An application for a Development Permit for Operational Works for services shall be obtained
prior to commencement of works.
16. All connections to sewer system shall be carried out either by Council or by a Council
approved Contractor and at no cost to Council. Any connection to a water main shall be
undertaken by Council.
17. An electricity service shall be provided to each lot. Full details of the proposal forwarded to
ENERGEX for its approval shall be submitted to Council.
The approval of ENERGEX and a “Certificate for Electricity Supply to Subdividers” will be
required to be submitted by Council prior to endorsing the Plan of Survey.
Any agreement with ENERGEX shall be wholly at the applicant's expense, and shall not
entail a financial encumbrance on future purchasers of the proposed lots.
The design is to be carried out by an Electrical Design Consultant approved by ENERGEX.
The consultant shall liaise with Council’s Manager - Works Support during preparation of the
design.
18. All site drainage shall be by means of gravity systems.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
Not applicable.
Page 6 of 8
Document Set ID: 25270716
Version: 4, Version Date: 27/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132000.200176.1 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 170 KB (small file)
- File type
No other editions are linked here.