SPA Decision Notice - 010.2010.00000812.001 [As Published] · 132010.812

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                             2010/812




37.   The existing 300mm stormwater drainage pipeline on the site shall be inspected by closed
      circuit television (CCTV) prior to the commencement of the civil works on the site, any existing
      damage or blockage shall be rectified by the developer prior to the construction of the
      driveway. Also, following satisfactory completion of the construction works all new stormwater
      pipelines that will be a Council’s asset and stormwater inter-allotment drainage shall be
      inspected by CCTV.
      CCTV inspections will be carried out by Council's CCTV contractor and arranged by Council.
      The developer will be responsible for the full cost of CCTV inspections, including any
      additional inspection necessary following defect identification and rectification. This charge is
      payable prior to the issue of Operational Works approval and will be determined on the unit
      rate basis current at the time of approval.
Service Easements on Lot 85 M11112 (Stormwater)
38.   A registered easement shall be required over any stormwater drainage pipes or overland flow
      paths within the site that convey stormwater from a Council road. The easement shall be in
      favour of Council, be a minimum of 3 metres wide within the site and be located adjacent to
      the northern boundary of the subject site.
      The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
      the Title Deed and the easement documents will be lodged at the Land Titles Office and any
      additional Titles Office forms or requisitions requiring the consent of Council will be attended to
      promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior
      to the use commencing. Any changes required by Council’s Solicitor must be corrected
      immediately.
39.   No building or other structure shall be constructed or encroach over an easement.
Earthworks
40.   All earthworks (filling or excavation) required on site shall be carried out in accordance with
      Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. Filling on the site
      shall not cause any additional ponding of water on any adjoining lands or the blockage of, or
      interference with, any natural watercourses.
41.   Any imported fill to the site may only be from a site licensed with The Environmental Protection
      Agency or from a site for which a Development Permit for Operational Works has been issued
      approving the export of fill.
42.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
      any fences to be replaced shall be clearly shown on the plans submitted for Operational
      Works approval.
Erosion and Sediment Control
43.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.
General Engineering Requirements
44.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.


                                                                                            Page 7 of 17

Used in these records

About this file

File size
295 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000812.001 [As Published].pdf · 295 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.