45. Digital detailed designs including drawings, calculations, specifications and a schedule of
works shall be submitted with any application for a Development Permit for Operational Works
in respect of roadworks and stormwater drainage works. The design shall be in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
and proposed services required by the development shall be shown on the plans.
46. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
47. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
48. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
49. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
50. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au). Approval of works shall not be granted until all As
Constructed information has been supplied and accepted by Council.
Unity Water
51. Reticulated water supply and sewerage must be provided to the development.
52. Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual
check).
53. The sewer inspection opening must be located a minimum of 1.0 metre from any structure and
be raised to the finished surface level of the site. If located within the paved driveway area the
inspection opening must be finished with a brass cap.
54. Storm water retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 metres from Council water supply and sewerage infrastructure .
55. Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
approved varieties and low growing when mature.
56. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Page 8 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000812.001 [As Published]Related documentApplication case desk ↗
About this file
- File size