Council archive · source document
Stormwater Management Report · MCU19/0008
aesthetic pollution of drainage paths; and
damage to local ecosystems.
4.2.1 Desi g n O b j ecti ves
Management of stormwater runoff during construction should be undertaken in accordance with
Appendix 2 of the SPP (July 2017). The SPP outlines the design objectives for construction phase
stormwater management. These are presented in Table 5, Table 6 and Table 7.
Table 5 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
Issue Desired Outcomes
Drainage Control 1. Manage stormwater flows around or through areas of exposed soil to
avoid contamination.
2. Manage sheet flows in order to avoid or minimise the generation of rill or
gully erosion.
3. Provide stable concentrated flow paths to achieve the construction
phase stormwater management design objectives for temporary
drainage works (part 2).
4. Provide emergency spillways for sediment basins to achieve the
construction phase stormwater management design objectives for
emergency spillways on temporary sediment basins (part 3).
Erosion Control 1. Stage clearing and construction works to minimise the area of exposed
soil at any one time.
2. Effectively cover or stabilise exposed soils prior to predicted rainfall.
3. Prior to completion of works for the development, and prior to removal
of sediment controls, all site surfaces must be effectively stabilised
using methods which will achieve effective short-term stabilisation.
Sediment Control 1. Direct runoff from exposed site soils to sediment controls that are
appropriate to the extent of disturbance and level of erosion risk.
2. All exposed areas greater than 2500 metres must be provided with
sediment controls which are designed, implemented and maintained
to a standard which would achieve at least 80% of the average annual
runoff volume of the contributing catchment treated (i.e. 80%
hydrological effectiveness) to 50mg/L Total Suspended Solids (TSS) or
less, and pH in the range (6.5–8.5).
Litter, Hydrocarbons and 1. Remove gross pollutants and litter.
other contaminants
2. Avoid the release of oil or visible sheen to released waters.
3. Dispose of waste containing contaminants at authorised facilities.
4 April 2019 Stormwater Management Report 11
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file