Council archive · source document
Stormwater Management Report · MCU19/0008
4 ST O RMWAT ER Q UAL I T Y M AN AG EMENT
4. 1 O p erati o n al Ph ase
The development is not required to meet the Queensland Governments State Planning Policy (July
2017) as the site does not exceed the 2,500m 2 minimum site area. Stormwater quality management is
therefore proposed to be undertaken via the application of best management practices (BMPs) to
ensure no adverse impacts to the downstream environment.
Pollutants typically generated during the operational phase of the development include:
litter/gross pollutants
sediment (Total Suspended Solids – TSS)
nutrients (Total Nitrogen and Total Phosphorus – TN & TP)
hydrocarbons (oils and grease)
heavy metals
Stormwater quality best management practices may be implemented for the development as follows:
First flush diversion system for roof water diverting the roof water for irrigation purposes
Gross pollutant filter baskets in field inlet pits collection runoff from ground areas.
Refer to Appendix B for the stormwater management drawing.
4. 2 Co n stru cti o n Ph ase
Management of stormwater runoff during construction and the implementation of an erosion & sediment
control program is necessary to avoid impacts to receiving waters from pollutants typically generated
during the construction phase. Typical pollutants are described in Table 4 below:
Table 4 – Pollutants Typically Generated During the Construction Phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
pH altering substances Acid sulphate soils, cement slurry and wash waters.
In addition to the degradation of receiving waters, impacts of inadequate erosion and sediment control
downstream from the site include:
traffic safety problems;
blocked drains;
local flooding problems;
4 April 2019 Stormwater Management Report 10
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.