Stormwater Management Report · MCU19/0008
Refer to Table 1 and Appendix B for further details of the proposed system.
Table 1 - Detention system details
Description Value
Tank Model 20 x Atlantis Flo-Tank - Triple
Gross Volume (m3) 7.32
Detention Capacity (m3) 6.96
Dimensions (m) 4.08(L) x 1.37(W) x 1.31(H)
Infiltration Rate (m/d) 0.6
Catchment Area to Tank (Ha) 0.040
Catchment Area Bypassing Tank (Ha) 0.021
3. 3 Hyd ro l o g i c an d Hyd rau l i c Mod el l i ng
The hydraulic and hydrologic modelling software package XPSTORM was used to model the pre-
developed and post-developed flow conditions for the site. XPSTORM provides a simulation of the
natural runoff processes and the hydraulic performance of stormwater infrastructure. An integrated
1D/2D hydraulic model was developed incorporating the TUFLOW engine. The TUFLOW engine
accurately represents site specific topography, defining flow paths, discharge, storage, and variation in
flow direction in addition to modelling flood hazard.
Hydrologic Modelling
The 0.5EY, 10% AEP and 1% AEP events were modelled. A number of storm durations including the
10 minute, 25 minute, and 1 hour duration were simulated for each return period for the pre-developed
and post-developed model.
Rainfall data was obtained from the ARR 2016 data hub. The ensemble of storms for each duration
was simulated for the pre-developed model and the median storm for each duration & ARI was
determined utilising the ensemble statistics utility. The resultant storms were utilised as the design
storms for each EY/AEP for both the pre and post developed models. The Laurenson method was
utilised to calculate runoff hydrographs with the following losses:
Pervious areas – initial and continuing losses of 10mm and 2.6mm respectively. The value for
initial loss has been reduced from the AR&R Data Hub value and is considered conservative
given the existing soil conditions.
Impervious areas – initial and continuing losses of 2mm and 0mm respectively
Hydraulic Modelling
An integrated 1D/2D model was developed to simulate the hydraulics of the stormwater drainage
network. The 1D network was limited to modelling the infiltration/detention tank in the post developed
model. Physical parameters for the storage node were calculated based on data obtained from the
manufacturer. The following parameters were utilised in developing the 2D network:
A 0.5m grid cell size was utilised.
The DTM was derived from LiDAR data obtained from DNRM
4 April 2019 Stormwater Management Report 6
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.