Stormwater Management Report · MCU19/0008
Manning’s roughness for of 0.06 was considered appropriate due to the land use of the site.
A 2D head boundary line with a free outfall was used to define the 2D model extent to
appropriately account for flow freely flowing east to Sunshine Beach.
Model Setup
Two models were developed for the site. These are summarised as follows:
Pre-developed model
The existing site was modelled as a single catchment (Node A). The hydrograph of the
catchment was linked to and evenly distributed across a rainfall/ flow area grid at the rear of
the site. The peak flow rate discharging to Sunshine Beach was measured at a flow line at the
rear of the site and the total runoff volume discharging to Sunshine Beach was measured as
the total runoff inflow at Node A.
Post-Developed Model
The developed site was modelled as two catchments. The rear portion of the site consisting of
pervious areas (Node A) was modelled as per Node A for the pre developed model. The upper
portion of the site consisting of impervious areas was linked to a storage node (Node B) linked
to the 2D network. This node was used to model the detention/infiltration tank. The peak flow
rate discharging to Sunshine Beach was measured at a flow line at the rear of the site and the
total runoff volume discharging to Sunshine Beach was measured as the sum of the total runoff
inflow at Node A and the total runoff outflow at Node B.
The catchment data for each model is summarised in Table 2 below:
Table 2 - Catchment Summary
Model Node Area (Ha) Slope (%) % Impervious
Pre Developed A 0.061 25 65
Post Developed A 0.021 25 10
B 0.040 25 83
3. 4 XP Sto rm Resu l ts
The results of the ensemble statistics utility are presented in Figures 2-4 below.
Figure 2 - Ensemble Statistics Utility Results; 0.5EY event
4 April 2019 Stormwater Management Report 7
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.