Request change to an approval 152004.240078.4
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
152004.240078.1
Park Dedication
15. Prior to approval of the Plan of Survey for Stage 2, the land indicated as Park on Plan of
Proposed Reconfiguration 90/108 T1 & T2 prepared by Max Watterson & Associates
-
and dated 9 May 2006 shall be dedicated to Council as "Park Public Use Land" at no
-
cost to Council.
16. The existing dam in proposed Lot 101 is to be retained as an open space feature and is
not to be filled. The batters of the dam will be adjusted so that they have a maximum
grade of 1 in 4 for safety purposes against accidental entry, as the dam will be in public
open space.
17. Where parks are proposed to be dedicated to Council, the following information shall be
submitted in conjunction with an application for Operational Works: -
17.1. Engineering details of the proposed clearing, filling and drainage works within the
park areas to achieve parks of the size required.
17.2. An Engineering assessment of any drainage problems, which may result on
- _
-adjoining- lots as a res lt of ny filling works, and the proposed means of
overcoming such problems.
17.3. A landscaping plan showing proposed revegetation works following completion of
the earthworks.
17.4. Clearly define the extent of the park area on site for inspection by relevant Council
personnel, prior to any earthworks or clearing works commencing.
17.5. The design, installation and construction details of playground equipment
complying with the relevant Australian Standards.
17.6. The location of all proposed drains entering the park including detailed outlet
controls
E rthworks
18. Earthworks shall be generally contained within existing and proposed road reserves.
Where earthworks are required for the provision of services, existing contours shall be
restored.
Water Supply
19. The development site shall be connected to Council’s Water Supply systems to the
standards and requirements of the Director of Works and at no cost to Council.
20. Each water connection to th,e water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the
Council.
21. Provision shall to be made in the park for a water connection. Under-road service
conduits shall be provided to ensure a connection is available.
22. Fire hydrants are to be provided throughout the development in accordance with Council
and Queensland Fire Service standards.
23. Detailed design drawings and calculations shall be submitted with an application for a
Develop’ment Permit for Operation Works (Services). To avoid conflict with other
underground pipes or services, all existing and proposed services required by the
.
development shall be shown on the plans.
24. _All connections to existing systems are to be carried out either by Councilor by a
Council approved contractor, and ,at no cost to Council.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request change to an approval 152004.240078.4Related documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.