Request change to an approval 152004.240078.4
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
152004.240078.1
Site, street and other close proximity trees shall be accurately located on the
-
------------Sit 7Iandscapel51an-an --snall~b -identifiea as eing therrefaine ,-tnmmed,------
transplanted or removed; and
Areas of cut and fill.
Where other permits for Operational Works for roads, drainage or access are required,
the landscaping layout shall be based on approved drawings for those Operational
Works.
53. A vegetation retention plan is to be submitted with the landscaping plan. The vegetation
retention plan is to indicate:-
road and service location
vegetation to be retained
measures employed to ensure vegetation retention.
Prior to landscaping beiog accepted "On Maintenance’~, _a certificate from a qualified
Landscape Architect or qualified Horticulturist shall be submitted certifying that he has
supervised the landscaping works required by this permit and have been carried out in
accordance with the approved plans and conditions and in accordance with best industry
practice.
Permanent Survey Marks
54. Prior to approval of the Plan of Survey for Stage 2, two new State Survey Marks shall be
provided, one on the Brewers Road frontage of the site and one in the new road section
of Tanderra Drive. It shall be levelled and located to the requirements of the
Development Engineer. A ’Form 6’ shall be subr’nitted for Council’t) records.
55. Each State or other Permanent
Survey Mark shall be installed clear of overhead
vegetation, making it suitable for
Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered Surveyor.
General
56. Prior to undertaking any excavation, the person acting on this permit shall contact public
utility service providers to ascertain the location of any- underground services associated
.
with the site.
57. Before the issuing of a Development Permit for Operational Works, the Applicant shall
sign a written undertaking to be responsible for the full cost of repairs to road pavement,
footpath, kerb and gutter, or other Council property damaged as a result of construction
of the proposed developmerit.
58. If any Council property or facilities (such as underground drainage or water supply) is
damaged by any person acting under a condition of this
permit, through any cause
whatsoever in the course of, directly or indirectly carrying out development, that person
shall forthwith notify the Director of Works and shall forthwith rectify that damage at its
cost and to the satisfaction of the Director of Works.
Alternatively, the Applicant may request the Council to carry out the rectification works. .
In all cases, Council reserves the right to carry out rectification works in an emergency
and where no reasonable attempt has been made to complete the rectification works as
.
part of the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to
.
the approval of the Plan of Survey.
59. No Council property or facility shall be interfered with during works associated with this
development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request change to an approval 152004.240078.4Related documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.