60. The following steps are to be undertaken prior to commencement of any construction:-
--
60.1~ ThePri~-~ip~1 C~~tr~~to~shall gi~e-- 60-undl’~ -1~sp~ct~r--~~v~~(7)d~y~’ ~~tic~-~f----
.
intention to commence works.
60.2. The Principal Contractor or any of his subcontractors shall not undertake any
works unless each contractor has public liability insurance in the sum of
$10,000,000 and copies of current public liability insurance policies are submitted
to Council’s inspector.
60.3. The Principal Contractor shall nominate a site representative and give a telephone
number that can reach the site representative at any time during a 24 hour day.
60.4. The site representative shall arrange to meet on-site with Council’s Inspector to
.
obtain Council’s requirements for construction of access.
60.5. All signage, including that for safety during construction, shall be in accordance
with the Manual of Uniform Traffic Control Devices and Department of Transport
(Main Roads Division) Roadworks Signing Guide.
61. Prior to excavating any material to be used for fill on this development site, a
Development Permit for Operational Works shall have been obtained for the site from
which the excavated material is won. A soil report shall be submitted with the
application certifying that the material is free of acid sulphate soils and other deleterious
.
materials.
62. The transportation of all materials to and from the development site shall be undertaken
in a manner such that particle matter escapes onto a public road. All vehicles
no
carrying materials either to or from the development site shall be covered to prevent
materials inciuding dust being \~/indblown from the vehicle.
63. A programme of works is to be .submitted with any application for a Development Permit
for Operational Works detailing the construction schedule and proposed prevention
measures.
Where the program is changed for any reason whatsoever, a copy of the revised
/’-pr:ogram shall be submitted to Council’s Works Inspector within seven (7)days.
64. Operational Works are to be carried outin a manner that prevents:-
64.1. Pollution of a waterway
64.2. Dust nuisance to residents in the vicinity
64.3. Transfer of dirt and debris onto a public road
64.4. Excessive noise (less than 1.5 Db above ambient measured at the lot boundaries)
64.5. Excessive traffic delays (less than 5 minute delays)
64.6. Diminishing of neighbourhood amenity (long term parking of employees vehicles,
parking of construction equipment etc.
65. Where Operational Works are likely to affect nearby residents, at least 3 days notice of
commencement ()f work, the name of the site supervisor, and a 24 hour contact
telephone number shall be distributed to affected residents.
66. All designs for engineering works involving the construction of pavements, kerb and
channel, vehicular access, footpaths, turnouts, stormwater drainage or water supply,
shall be prepared in accordance with the requirements of Council’s Engineering Design
Standards, shall reference where applicable to Council’s Standard Drawings, and shall
incorporate best engineering practice.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request change to an approval 152004.240078.4Related documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.