67. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineerin’g works, which shall -be submitted n
,conjunction with an application for a Development Permit for Operational Works.
68. Prior to Council approving the Plan of Survey, a certificate from a registered
Professional Civil Engineer shall be submitted to Council for each Development Permit
for Operational Works issued pursuant to this permit. The engineer shall certify that he
has supervised those works and that they have been completed in a workman like
manner in accordance with good engineering practice and in accordance with that
permit.
69. As Constructed drawings certified by a registered surveyor showing extent and finished
levels are to be submitted for Council’s records.
These drawings must fully detail levels for all engineering works including drainage
structures, building floor levels, finished ground levels effluent trenches and pavement
surface levels. Drawings shall be on transparencies, a hard copy highlighting any
changes from design and in electronic format on an IBM PC compatible floppy disk in a
format capable of integration with Council’s computer system.
70. A Development Permit for Operational Works must be obtained prior to commencing any
work.
71. An environmental management plan covering all aspects of the development shall be
submitted in conjunction with any application for a Development Permit for Operational
Works.
Sediment and Erosion Control
6’2. To protect the environment against siltation/sediment export or soil erosion as a result of
this development, an erosion and sediment control plan shall be submitted in
conjunction with a Development Permit for Operational Works. Site control measures
such as silt fencing, controlled gravel access to the site and controlled disposal of waste,
may be necessary.
All physical site control measures shall be installed and maintained until all Operational
Works have been completed and accepted "On Maintenance" and the erosion and
sediment control plan adhered to at all times.
Future Permits Required
73. For the following classes of work associated with development, a Development Permit
for Operational Works mus;t be obtained prior to commencement of works relating to that
class of work. The application may combine any or all of these classes of work: -
73.1, Site Civil Works
73.2. Roadworks
73.3. Stormwater Drainage
73.4. Frontage works
73.5. Water reticulation
73.6. Landscaping
15. :REFERRALAGENGY( Nb TI ’NS ’
.".;.: :~’ .
.
",/
.
’.~:<:I
.... .,/;’P’
Not Applicable
pn_nA_~~A~A7/1_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request change to an approval 152004.240078.4Related documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.