Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
FSL 123.60
Se
al
PUMP
20KL UNDER GROUND RAINWATER REUSE
TANK (ROCLA ECORAIN20 OR EQUIVALENT)
O
LANDSCAPING
121)
ie
BOOSTER
INDICATIVE BIO—RETENTION
qj Ke
ie <hs
LY -
i
—
rs. vass7| a
|
OQ.
g
.
CANOPY ROOFWATER DIRECTED
TO BIO-RETENTION BASIN
RUNOFF FROM BOWSER AREA
DIRECTED TO HOLDING TANK
FSL 123.25
FSL 123.18
annscrP NS
OO
a
INDICATIVE UNDERGROUND
DETENTION TANK.
FSL 124.05
EXIT
FSL_123.75
TRAFFICABLE GRATED DRAIN
FSL 122.47 @
IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION
PROPOSED FINISHED
SURFACE LEVEL
PROPOSED STORMWATER INLET STRUCTURE
WITH STORMSACK OR ENVIROPOD
PROPOSED STORMWATER
FSL 123.30
ENTRY
EXIT
FSL 122.00
PROPOSED STORMWATER PIPE TO CONNECT
TO EXISTING STORMWATER MAINTENANCE,
HOLE. EXISTING INVERT LEVEL 118.413
Check all dimensions before commencement of work.
BASIN LOCATION Check Site boundary dimensions from the Tile plans
Check Building Boundary clearances by set out.
1:400 (A3) Notwithstanding the information supplied on this drawing,
1:200 (Al) the location, depth and extent of underground or overhecd
“ services are to be confirmed and protected on site by the}
contractor prior to commencement of works.
‘Approved + a
Checked - SR s Consulting Civil & UA Lp Drawing title ~ Project - PROPOSED SERVICE Site - Project 161968 Sheet No. SWMPO1
Design - JM Drawn -_ AS A Structural Engineers | KEVIN COVEY Béng,cPEng.MicAust MSPEPNG,RPEC-1823| STORMWATER CENTRE TAYLOR COURT, Digital Ret ; SIMEOL SOMITE osu: B
Y . CHRIS. CAMP Eng(Hons) MEAust,RPEQ—4944 uvent
Scales - 1:400(A3) Date - JUN 16 | toshtwenwenTS aS coves Project Management] 124 pUPORTH AVENUE Ph (07) 5443 7777 MANAGEMENT LAYOUT PLAN | Client - HASS HOLDINGS ATF, COOROY, QUEENSLAND This Document is copyright and shall not be copied
7108-06-16] APPROVAL ESUE as] ASSOCIATES PTY LTD 3 pignniny PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - APPROVAL ‘ABN 59 137 305 992 9 MAROOCHYDORE QLD 4558 THE QUASAR TRUST for the Development and the Site Specie.)
issue Date Description
E-MAIL: [email protected]
By
T:\QIOBS\T6\ FSTUBB\DUG Covey\\Stormwater Management Plans\Uncontroled\SWMPOT STORMWATER WANEGEMENT LAYOUT PLAN-dwa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.