Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
INDICATIVE BALUSTRADE
FENCE/HANDRAIL
CLEAN OUT POINTS
AT END OF THE LINE
STANDARD FIELD
INLET PIT 900x600
/ INLET PIPE
INDICATIVE,
RETAINING WALL
SLOTTED [email protected]% — TYP.
RAISED CONCRETE BARRIER
AROUND FOREBAY — REFER DETAIL B
CONCRETE FOREBAY
INDICATIVE GATE FOR
SKIDSTEER MAINTENANCE ACCESS
9600 CAST IRON LID
005 1
1:150
(a3) \
1:75
(a1)
IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION
LEGEND
PROPOSED FINISHED
SURFACE LEVEL
PROPOSED STORMWATER INLET STRUCTURE
WITH STORMSACK OR ENVIROPOD
PROPOSED STORMWATER
PROPOSED TOP OF BATTER
STANDARD FIELD
INLET PIT 1200x1200
INDICATIVE GATE FOR
BASIN STAIRWELL ACCESS
SKIDSTEER MAINTENANCE ACCESS
OVERFLOW WEIR
Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead!
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
Checked - SR Consutingcwia [PP Drawing title — Project - PROPOSED SERVICE Site -
Design - JM Drawn - AS a Structural Engineers kevin covey (Sn PereAeN USPENGPED-102 CONCEPT BIO-BASIN AND CENTRE TAYLOR COURT,
Scales - 1:150 (A3) Date - JUN 16 | toehwenwenTS aS COVEY Project Management] 124 DupoRTH AVENUE Ph (07) 8443. 7777 DETENTION TANK LAYOUT Client - HASS HOLDINGS ATF, COOROY, QUEENSLAND
0 ~ 7 [06-05-16 APPROVAL ISSUE fs] ASSOCIATES PTY LTO. planning PO BOK 18 ip asap FOE (07) BAAS 7577 PLAN
ocument Stoge - APPROVAL | 3. Dessriptn ‘ABN 59 137 305 992 YAROOCHYDORE, OUP 4558 ou THE QUASAR TRUST
Project 161968 Sheet No. SWMPO2
Digital Ref BOLBASN AND. DETENTON | B
gta! Net TaN DETALS PLAN ssue
This Document is copyright and shall not be copied
without written approval, nor shall it be used except
for the Development and the Site Specie.)
By
O:\QJOBS\16\161968\DWG Covey\Stormwater Management Plans\Uncontrolled\SWMPO3 CONCEPT BIO-BASIN AND DETENTION TANK DETAILS PLAN.dwq
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.