Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
CONTENTS
1.0 INTRODUCTION 1
2.0 SITE DESCRIPTION 1
2.1 Site Location 1
2.2 Previous Land-use, Topography and Drainage 2
2.3 Proposed Land-use 2
3.0 WATER QUALITY AND TREATMENT OBJECTIVES 2
3.1 Water Quality Objectives 3
3.2 Area of Treatment 3
3.3 Non-treatment Areas 3
4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH 4
4.1 Scenario Methodology 4
4.2 MUSIC Model Parameters 5
4.3 Land Use/Source Node Areas. 5
4.4 Proposed Stormwater Treatment Train 6
4.5 Pollutant Reduction Results 6
5.0 MAINTENANCE PERIOD 7
5.1 Bioretention Basin 7
5.1.1 Maintenance During ‘Construction Phase’ 7
6.0 STORMWATER QUANTITY 8
6.1 Stormwater Quantity Management 8
6.2 Hydrology (XP-RAFTS) 8
6.3 XP-RAFTS Data 8
6.3.1 Model Scenarios 8
6.3.2 Rainfall Intensities 8
6.3.3 Existing and Proposed Development Areas 9
6.3.4 Initial and Continuing Losses 9
6.3.5 Pervious and Impervious Areas 9
6.3.6 Manning’s Values 10
6.3.7 Catchment Slope 10
6.3.8 Storm Durations 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.