Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
6.4 Calibration 10
6.4.1 Rational Method 10
6.5 Design Discharges Unmitigated 10
6.5.1 Peak Durations 10
6.6 Stormwater Detention 11
6.6.1 Detention Tank 11
7.0 CONCLUSIONS AND RECOMMENDATIONS 12
REFERENCES 13
______________________________________________________________________________
LIST OF APPENDICES
APPENDIX A Site Layout Plan by Reddog Architects
APPENDIX B Stormwater Management Plans by Covey Associates
APPENDIX C MUSIC Concept Map
APPENDIX D Stormsack Details
APPENDIX E Water and Sewage Demand Table
APPENDIX F Stormwater Quantity Catchment Plans
APPENDIX G Rainfall Data, Rational Method Data and Results
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.