Original source · versioned page text
Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
Site
Area
Figure 2 - Site Locality (image accessed from Nearmap on 11 August 2015)
2.2 Previous Land-use, Topography and Drainage
The site is currently vacant land and was previously used as a temporary depot for the machinery
used for the upgrade of the Bruce Highway. The site predominantly drains from north to south, with
an approximate slope of 4%.
2.3 Proposed Land-use
The overall site area is approximately 8243m2, with the area of the proposed new development
utilising the entirety of the site. The proposed development for a highway service centre includes
the service station bowsers, fast food outlet, service station, children’s play area, services, truck
parking and associated carparking and landscaped areas.
A Site Plan is located in Appendix A for further detail.
3.0 WATER QUALITY AND TREATMENT OBJECTIVES
This SMP will demonstrate how the proposed stormwater management strategy complies with the
requirements of the Noosa Shire Council (NSC) and the State Planning Policy (2014), in terms of
demonstrating how the relevant stormwater pollutant reduction objectives will be met. Discharge
from the site must achieve pollutant load reduction targets (Table 1) and be demonstrated through
use of the appropriate modelling software.
Table 1 – Pollutant Reduction Targets for South East Queensland
Pollutant Type Reduction Objective
Total Suspended Solids (TSS) 80% reduction in average annual load of pollutants
Total Phosphorus (TP) 60% reduction in average annual load of pollutants
Total Nitrogen (TN) 45% reduction in average annual load of pollutants
Gross Pollutants (GP) 90% reduction in average annual load of pollutants
Covey Associates Pty Ltd 2 Project No: 161968
Consulting Engineers 100415 Rpt Iss B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.