Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
1.0 INTRODUCTION
This Stormwater Management Plan (SMP) contains information regarding the stormwater
management strategies for a proposed Highway Service Centre, including a fast food outlet at
Taylor Court, Cooroy. This report refers to the stormwater quality and quantity treatment measures
proposed of the site in its entirety.
The site is identified to be located within the catchment area for Lake Macdonald. The application
has previously been assessed against Seqwater Development Guidelines: Development
Guidelines for Water Quality Management in Drinking Water Catchments. Third party advice from
Seqwater (ref CE:DB F.16/3997) requested further detail in relation to the Water Quality
Objectives and the annual rainfall used for water quality modelling.
Noosa Shire Council (NSC) requires that stormwater be appropriately managed prior to discharge
from the site. The Queensland State Planning Policy (2014) and Seqwater Development
Guidelines also requires that urban development projects demonstrate how the potential impacts
to receiving environments are mitigated.
2.0 SITE DESCRIPTION
2.1 Site Location
The site is located at 6 Taylor Court, Cooroy. The real property description is Lot 3 on SP197517
(Figure 1). The site is bounded by vacant land to the west and south, Taylor Court exists to the
east and Holts Road and the Bruce Highway to the north (Figure 2). The site is adjacent to the
newly upgraded section of the Bruce Highway.
A Site Plan is presented in Appendix A for additional information and details of the proposed
development.
Site
Area
Figure 1 - Site area
Covey Associates Pty Ltd 1 Project No: 161968
Consulting Engineers 100415 Rpt Iss B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.