Revised Stormwater Management Plan

Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.

Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                               Location: Taylor Court, Cooroy

(1) Fast food area:                             0.14 EP x 40 L/day x number of seats (70)
                                                = 392 L/day
(2) Service Station Shop:                       3.96 EP (per 100 m2/GFA) x 195 m2 (1.95 GFA) x 40 L/day
                                                = 309 L/day
(3) Landscaping                                 1940 m2 x 0.60m (annual irrigation application)
                                                = 1164 KL/year
                                                = 3189 L/day
Total:                                          3890 L/day (3.9 KL/day)
Annual:                                         1420 KL/yr

The reuse estimates for the site is calculated based upon WSUD (2010) and GCCC Water
Demand Guidelines to be 3.9 kL/day which equates to 1420 kL/yr. A rainwater tank of 20,000 L
has been proposed based on the historical requirements of 15L per m2 of roof area. This provides
an additional storage volume of approximately 10,000L. All of the roof area of the service station
(766m2) stormwater is to be directed to the rainwater tank. Roof area from the canopy will not be
directed to the tank.

4.3 MUSIC Model Parameters

The MUSIC Modelling Guidelines – South East Queensland Version 1.0 (2010) was used to
source base and storm flow concentrations and runoff generation. The model was calibrated using
the Bureau of Meteorology (BOM) data from Cooroy Composite, 1973 - 1983, at a 6-minute time
step. The annual rainfall data for this site and timeframe used is in Table 3 below. This is in
accordance with Water by Design’s MUSIC Modelling Guidelines – South East Queensland
Version 1.0 (2010). All source nodes were set up in accordance with this guideline, specifically for
split catchments. The source nodes were set up as ‘commercial’ due to the site characteristics
being similar to those in a commercial area. No routing of drainage links was adopted for the
purpose of taking a conservative approach. This approach assumes that the flow through the
drainage system takes no time, which over estimates the likely pollutant load.
                                                 Table 3 Annual Rainfall
Year                1973     1974      1975       1976       1977    1978      1979     1980     1981      1982     1983
Annual
                    2135.5   2796.1    1178.9     2108.7     950.2   1468.5    1023.7   1232.4   1507.3     1332    2040.8
Rainfall (mm)

4.4 Land Use/Source Node Areas.

The proposed development has been treated as one (1) catchment. The catchment has further
been divided into contributing roof, landscaping, hardstand and road area. Refer to Table 4 for
details. A MUSIC model concept map is located in Appendix C.

                               Table 4 – MUSIC Source Node Attribute Summary
                                                                              Area
                                          Source Node
                                                                               (ha)
                                               Roof                           0.077
                                           Canopy Roof                        0.035
                                              Road                            0.445
                                           Landscaping                        0.182
                                            Hardstand                         0.017
                                         Untreated Road                       0.054
                                      Untreated Landscaping                   0.013
                                              Total                           0.823




Covey Associates Pty Ltd                                 5                                              Project No: 161968
Consulting Engineers                                                                                       100415 Rpt Iss B
Log in to download the original file

Revised Stormwater Management Plan.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.