Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
Figure 4 MUSIC Model Layout
4.5 Proposed Stormwater Treatment Train
A 20,000 litre rainwater tank is proposed to collect and treat roof stormwater runoff. The remaining
areas of the site will receive primary treatment via SPEL Stormsack’s installed in each stormwater
pit on site – Refer to Appendix D for details. The proposed tertiary treatment to discharge off site is
a Bioretention Basin. Refer to Table 5 for bioretention basin sizing. Filter media is established to a
depth of 0.5 m, with a 0.1 m and 0.2 m transition and drainage layer, respectively. The extended
detention depth is 0.3 m.
Table 5 –Type and Size of Stormwater Treatment Device
Stormwater Treatment Device Detail
Catchment 1
Rainwater Tank 20,000 L
SPEL Stormsacks Nine (9)
Bioretention basin 115 m2 Surface Area, 90 m2 Filter Area
4.6 Pollutant Reduction Results
MUSIC modelling of the proposed stormwater treatment strategy for the site was performed to
ensure the identified load based pollutant reduction objectives were achieved. MUSIC version 6.2
has been used to model the effectiveness of the designed stormwater treatment trains.
The target reductions in stormwater pollutants are based on a comparison of an unmitigated
scenario i.e. having no treatment on site, and the mitigated scenario, which has stormwater
treatment measures incorporated into the site. The results of the MUSIC models for the each
catchment and the overall site can be found in Table 6 and demonstrate that compliance has been
met or exceeded for all the required pollutant load reduction objectives stated in the State Planning
Policy (2014) at catchment and site level.
Table 6 – MUSIC Results –Treatment Train Effectiveness
Reduction Target
Unmitigated Mitigated
Pollutant Achieved Reduction Compliance
(kg/yr) (kg/yr)
(%) (%)
TSS 3410 498 86 80 Y
TP 6.39 1.16 82 60 Y
TN 35.1 11.2 69 45 Y
GP 234 0 100 90 Y
Covey Associates Pty Ltd 6 Project No: 161968
Consulting Engineers 100415 Rpt Iss B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.