Referral Agency Response - Minor Change - Planning RAP21 0043.01 (As Published) · RAP21/0043.01
Geotechnical Stability
18. All works must be carried out in accordance with the recommendations, including the
preparation of a Dilapidation Report, contained in:
a. The Slope Stability Assessment – Report No. 31173 (SL) prepared by SCG
Consulting Engineers dated 24 February 2022, and
b. The Soil Test and Footing Report - Report No. 31173 (S).Rev A prepared by SCG
Consulting Engineers dated 24 February 2022.
19. At the completion of the works certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with
the conditions of this approval and that the development has a minimum factor of safety
against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
20. All earthworks and associated retaining structures/batters must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
21. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
22. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
23. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
2. REASONS FOR INCLUSION OF CONDITIONS
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
3. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Page 4 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Minor Change - Planning RAP21 0043.01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 107 KB (small file)
- File type
No other editions are linked here.