Council archive · source document
Referral Agency Response - Minor Change - Planning RAP21 0043.01 (As Published) · RAP21/0043.01
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Qualified Person
3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a) is a Registered Professional Engineer of Queensland (RPEQ); and
b) has a degree in civil engineering or engineering geology; and
c) has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Preparation of a Preliminary Construction Management Plan
4. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a) appropriate traffic signage in accordance with the Manual of Uniform Traffic
Control Devices (MUTCD)
b) provision for safe vehicle and pedestrian access across the frontage of the site
both during daily construction and after daily construction has ceased.
c) it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Private Infrastructure
5. All private infrastructure for the development must be designed to meet the planning
scheme requirements unless otherwise agreed by the relevant authority.
Infrastructure Charges
6. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue.
4. REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant may make representations to Council about this referral agency response at
any time before the application is decided pursuant to section 30 of the Development
Assessment Rules.
Yours faithfully,
Tiani Bird
Development Planner
Enc: Approved Plans/Documents
Page 5 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Minor Change - Planning RAP21 0043.01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 107 KB (small file)
- File type
No other editions are linked here.