Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix E- Traffic Impact Assessment.pdf

of 151

Page text read automatically using OCR, there may be inaccuracies

b)   ensure lower speeds near areas of high pedestrian       a)    sight distances of at least 2.5             of any obstructions and encourage slow
     activity through the use of appropriate road                  seconds travel time at the                  vehicle speeds.
     geometry or devices designed to limit speed; and              designated speed are provided;
c)   maintain sight distances which are appropriate for      b) splayed corners on structures are
     the likely operating speeds in all areas of potential         incorporated;
     pedestrian/vehicle conflict.                            c)     landscaping is designed to allow
                                                                   clear views; and
                                                             d) sign placement ensures that sight
                                                                   distance requirements are not
                                                                   impeded.
 PO12                                                        AO12.1                                      N/A   Complies with PO12
 A clearly defined pedestrian network is provided that –     In large open carparks with greater than          The subject development’s carpark
(a) is located in areas where people will choose to walk;    200 car parking spaces, a pedestrian              provides appropriately spaced pedestrian
(b) ensures that pedestrian movement through car             path between parking spaces is                    cut throughs between parking spaces and
                                                             provided on every second aisle.                   pedestrian walkways.
    parking areas or structures are along aisles rather
    than across them.
                                                             AO12.2                                      N/A   Refer to the attached SLR Traffic Impact
             .                                               For a minimum of 50% of car parking               Assessment report.
                                                             spaces, pedestrian access to buildings
                                                             is not across or through driveways,
                                                             carparks, setdown or manoeuvring
                                                             areas.
PO13                                                         No acceptable outcome provided                   Complies with PO13
Provision is made for pedestrian and vehicular queues at                                                       Sufficient space is provided to
conflict points.                                                                                               accommodate pedestrian and vehicular
                                                                                                               queuing at conflict points.
PO14                                                         AO14                                        N/A   AO14 not applicable.
Parking areas are lit to provide security for night-time     Lighting is provided in accordance with           Lighting considerations are beyond the
users.                                                       the Australian Standard for Road                  scope of this traffic assessment.
                                                             Lighting - Vehicular Traffic (Category
                                                             V) Lighting - Performance Installation
                                                             and Design Requirements.
PO15                                                         AO15                                             Complies with PO15
Site facilities encourage users and employees                End-of-trip facilities are maintained and         End-of-trip facilities are provided in
to access the site by means of foot or bicycle through       accessible to all users of the premises           accordance with Council’s planning
                                                             as part of common property.                       scheme requirements.

Log in to download the original (Appendix E- Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.